actually "worst case scenario" as you state, would be "cancellation" not a temp suspension.
all i did was call the ICC-ES Engineer on the filing page that you guys posted and he said that it had NO-IMPACT on the product at this time. Also, that cancellation, if it ever came was "A long way down the road".
you make this out to be "Worst case Scenario" for "Anyone With a Building Product" which is simply false.
peace