InvestorsHub Logo

mjkiii

04/24/12 4:22 PM

#14267 RE: carlosc #14265

I believe the April 2011 Analyst tour,

that was posted on Inmet or the AIF showed the detailed maps. There was also a helicopter tour video that flew over the entire route. On one of the sites there was a very detailed virtual map of all the roads in topographical 3-D that showed every hill and curve on the entire route. The short by-pass road is to make it possible to go to Minera-Panama without having to go through Molejon. 30MM cu. mtrs. of aggregate will build a lot of roads! That is $600,000,000.00 of revenue with a 75% GPM for PDI.