alea, its really hard to strike secret deals with the gov, one would think Wave would either say something in the next few days or they are waiting for actual drives to start to roll. PRing a pre-deploymnet engineering team makes for a cumbersome read, and SED supplies have been irregular and hampered by the Japan tsunami and the Thailand floods. If I were Wave I'd be sick of constant CC where is BEWML stuff and just PR when there is a PO and leave it at that. If the FBCB2 thingy plays out through 2013, one would be talking the 1-1.5m/q range, billed on delivery. Not earth shattering. I think flipping the whole shelf into the ATM facility was a cover all contingencies move.