Did I hear someone say 'resources'? :)
Donald W. Tully, P. Engineer on April 14, 1998 recapped the drilling report as follows:
"The Drilling Program was done with a large rotary down-hole-hammer drilling machine which was capable of drilling both vertical and angle holes. Samples were taken at five foot intervals. Five angle holes, totaling 2,245 feet, were drilled in the Oro Fino area. Two angle holes, totaling 1,025 feet were drilled in the Keystone/Illinois Central area. Three vertical holes, totaling 685 feet were drilled in the Cow Cornice Basin area. This was a limited exploratory program. The two holes that were drilled in the Keystone/Illinois Central and North Empire zones of the Central Vein System on the Mountain, approximately midway between the North and South shafts of the Poorman Mine, struck extremely strong new vein structures. These structures showed 1,000 ppm in Gold (23.86 oz Gold / Ton).