goofydrego

06/01/08 6:23 PM

#19791 RE: goofydrego #19790

i want to thank everybody for all the work done on rees. what an eyeopener for me. most of them i have never heard of and certainly didnt realise their importance and the effect on the economy and in our daily lives. what a bonus for us and what timing for shareholders if we can viably use what we have. thank you again.
goofy drego

lc45

06/01/08 7:12 PM

#19795 RE: goofydrego #19790

goofy, To get the drilling done previously there had to be heavy equipment moved in over some form of road to each of the bore sites. That roadway would certainly need upgrading by this time, but would mean we aren't inventing the wheel either. Big difference. What we don't know is the length of the needed upgrades. Couple of cats and a few days if the distance is short, and the gravel is already there. Only need to get to site #one for the drilling to begin, and the road to other sites can be worked on as the drilling is proceeding. However, in those remote areas it could possibly be a few miles of upgrades, even including the roads leading to the SRSR property. Maybe someone who is familiar with the area can shed some light on that aspect. I don't expect it will be a major delay though. I'm sure they checked all of that out already, have estimates, and plans in place. GLTA LC