InvestorsHub Logo

Mr. C

01/28/24 12:31 PM

#48935 RE: jerrybrockman #48933

No, one is for the FERC permit extension and the other is for the Non-FTA permit extension with the DOE. Two different things, but the DOE is requiring that construction starts prior to the 6/1/2024 expiration of that permit. Maybe the DOE is requiring the construction is or includes the on-shore facility or maybe just the ships, since it is a floating LNG. Two different permits we are talking about though