InvestorsHub Logo
Followers 5
Posts 752
Boards Moderated 0
Alias Born 08/10/2022

Re: jerrybrockman post# 48933

Sunday, 01/28/2024 12:31:47 PM

Sunday, January 28, 2024 12:31:47 PM

Post# of 51683
No, one is for the FERC permit extension and the other is for the Non-FTA permit extension with the DOE. Two different things, but the DOE is requiring that construction starts prior to the 6/1/2024 expiration of that permit. Maybe the DOE is requiring the construction is or includes the on-shore facility or maybe just the ships, since it is a floating LNG. Two different permits we are talking about though