InvestorsHub Logo
Followers 743
Posts 61941
Boards Moderated 10
Alias Born 10/05/2009

Re: micah211099 post# 32848

Wednesday, 01/21/2015 3:27:09 AM

Wednesday, January 21, 2015 3:27:09 AM

Post# of 85936
Great point, here is the link

http://www.otcmarkets.com/edgar/GetFilingHtml?FilingID=9621266

Phase 3: Reactor scale-up
Design
Can $165,000 Labor
Can $15,375 materials

TOTAL of phase 1 through 5

Can $585,000 Labor +cost of Phase 5 (no limit set on it, TBD) plus Can $61,500 materials

This does not include LaFarge in any way!!!! And this has nothing to do with the LaFarge pilot plant. The LaFarge pilot plant is a separate deal entirely!!!! It has separate Alstom-LaFarge-MVTG funding.....

This one is not (yet) smile officially connected to the German Bavarian brewery. But if one carefully connects the dots and hints in prior PRs and SEC fillings, one can see where there is probably heading.

This is not connected to the MVTG MRFC fuel cells, fuel cell vehicles or the energy storage MVTG-ERC-MRFC technology, or 3D printing technology or CO2 membrane based carbon capture I suspect is part of the 5 new patent applications we have not seen yet (waiting for them to be published).

Ambition with out knowledge is like ship in dry dock, going nowhere FAST!
Please Check out my Favorites DD page here:
http://investorshub.advfn.com/Ecomikes-Favorite-stock-picks-and-Stock-DD-topics-26971/

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent HWNI News