Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Wow, interesting and yes
LOL ring leader Ward, would be great if he had that much influence
I doubt Eduardo knew there would be a fiasco so his prediction was based on something else?
Good luck! Today I reached out to the editor of a Mexican publication who I have had some contact with before and who interviewed Sergio on the night of the “celebration” and who 100% thought everything was a go. At that time. And they discussed Michael’s projects. I have not heard back yet
I’m more curious who’s buying, especially the one who cleared up to .06 yesterday
Interesting, seems like it started with the buyer from yesterday
The bitterness is breathtaking
No doubt someone's going to accuse you of selling to your nephew!
The natural gas revolution: an optimistic perspective
North America is strongly increasing its export capacity and even Warren Buffett is taking positions
https://cincodias.elpais.com/mercados-financieros/2023-09-25/la-revoucion-del-gas-natural-una-perspectiva-optimista.html
No doubt CelNav, but corruption and high stakes politics are at play as usual
Yes that would be great, but I haven't seen Mirage mentioned by Silva yet.
This project is also in Tamaulipas and mentions Mirage.
San Fernando–Cactus is located in Tamaulipas, Mexico. The pipeline is owned by Mirage Energy Corp. It will be operated by WPF Mexico Pipelines S de RL de CV. The project is currently in the announced stage and is expected to start operations in 2023.
San Fernando–Cactus Pipeline profile includes core details such as name, location (start and end points and route points), pipeline type, asset status, start year, owner and equity stakes, operator, length, diameter, design pressure and installed capacity along with relevant news, deals and contracts details.
This is an on-demand report that will be delivered upon request. The report will be delivered within 1 business day of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance.
https://www.globaldata.com/store/report/san-fernando-cactus-pipeline-mexico-profile-innovation-and-trend-analysis/
The most dubious name I see is R. Kaiser ..Ringer connection
Not at all unusual. Take a look at a company called diamondhead. CEO shows back pay of $3.7 million with an additional $2.7 million in accrued interest. Ward hasn’t learned that trick yet I guess lol
And ANY other penny!
Increase of 1,100,000 total outstanding shares (all restricted) as of September 20, 2023
O/S 516,844,269
Restricted 288,335,160
Unrestricted 228,509,109
Ward didn't have anything to do with that celebration or the posting of it
Oh I agree with you, but I think that the 'announcement' celebration wasn't supposed to happen yet or at least not videotaped and posted on FB. Definitely a lot going on behind the scenes
Either way whatever that was it clearly was not received well by the higher powers and thus created more of a political mess than was even there before
Honestly I don't have an opinion on what the money is needed for, other than to say it is very costly doing business in Mexico for many reasons.
As of the last 10Q there was $325k in outstanding A/P and $127k for a loan. Plus ongoing expenses.
I'm just glad he's not taking out toxic financing.
It should be in the 10K where the money went and who provided the money
They propose to implement a Data Room regarding the JAF gas field
09/15/2023 10:59 am Author: Editorial Source: SIT/ DIARIO PRESENTE
The proposal was made during the signing of a collaboration agreement for the exchange of statistical and technical information between Cenagas and the CNH
The National Hydrocarbons Commission (CNH) , in coordination with the National Natural Gas Control Center ( Cenagas ), could implement a Data Room regarding the JAF gas field, for its tender as a natural gas storage unit.
The above was proposed by Abraham David Alipi Mena , general director of Cenagas , during the signing of a collaboration agreement held this morning between both bodies.
The JAF field is located in the state of Veracruz and formally concluded its dry gas production in 2014, so in 2019 Cenagas requested the Ministry of Energy (Sener) for authorization to modify the title of the assignment A-0163- M-Campo JAF , with the purpose of transforming it into a gas tank.
Launch
In June of this year, the Center announced the launch of the corresponding call .
The Data Room would be a tool similar to the one that the CNH safeguards with the geophysical, seismic and geoseismic information , among others, of all the hydrocarbon deposits in the country studied and analyzed to date.
https://www.diariopresente.mx/mexico/proponen-cuarto-de-datos-para-licitacion-del-gas-natural/384120
So much mention of Campo Brasil, will be interesting to see what happens and if Mirage will be mentioned
The official was invited to present the potential of the logistics, commercial and economic hub that is being developed in the north of the state; This thanks to projects such as the Campo Brasil natural gas storage and the fertilizer plant
https://www.msn.com/es-mx/noticias/mexico/tamaulipas-invita-a-la-naviera-maersk-a-invertir-en-el-puerto-de-matamoros/ar-AA1gvXpZ
I can't say I can deduce much from that. Not clear as usual from Mexico. It doesn't mention Mirage projects specifically. In my opinion I don't think they can wait any longer on the storage projects, I still think they will tender this year
AMLO will leave a dozen energy works unfinished at the end of his six-year term
https://www.bloomberglinea.com/latinoamerica/mexico/amlo-dejara-inconclusas-una-decena-de-obras-energeticas-al-final-de-su-sexenio/?utm_source=twitter&utm_medium=organic&utm_campaign=post&utm_id=CTA
No change to share structure as of 9/7/23 update
O/S 515,744,269
Restricted 287,235,160
Unrestricted 228,509,109
Not sure why they updated so early in the month, especially 6 days after last update
16M on the bid
Looks like Former Mexico City Mayor Claudia Sheinbaum should be announced as the Moreno party nominee
This article says she is a close ally of AMLO
https://www.usnews.com/news/world/articles/2023-09-05/mexicos-sheinbaum-favorite-to-win-presidential-nomination-poll-shows
Excellent article..
For North American Energy Security, Go Local: Examining the Role of Natural Gas and Mexico’s Energy Sector
https://www.csis.org/analysis/north-american-energy-security-go-local-examining-role-natural-gas-and-mexicos-energy
Mexico Ruling Party Picks Presidential Candidate: What to Watch
https://www.msn.com/en-us/news/world/mexico-ruling-party-picks-presidential-candidate-what-to-watch/ar-AA1ggv1K
My lowlife comment was for the asshole who made a lot of money at other’s expense here and still bashes the stock that made him that money. That’s the definition of the lowest of lowlifes
Zero chance. Wow such misguided focus on the single biggest shareholder with by far the most to lose besides Ward and his family
The lowest of lowlifes
Increase of 7,030,000 total outstanding shares (all restricted)
O/S 515,744,269
Restricted 287,235,160
Unrestricted 228,509,109
That's interesting since today is the 15th day from the 'fake' letter.
But I'm guessing no connection, but where did you see about the big press conference?
Tamaulipas Energy Development promotes 11 priority projects in the sector
Plans range from the use and storage of natural gas, the port of Matamoros, as well as photovoltaic parks in marginalized regions
Victor Hugo Duran
Tampico /28.08.2023 06:21:35
By being established last week as one more entity within the government structure, the Secretariat of Energy Development in Tamaulipas promotes 11 priority projects , focused on natural gas , the development of the port of Matamoros , in addition to taking advantage of photovoltaic energy and Resources that help marginalized communities.
Said strategy was presented by the incumbent José Ramón Silva Arizabalo during the "Impulsa" Forum , organized in Mexico City by civil associations in collaboration with the Chamber of Deputies , held last Saturday, where other entities besides the private initiative gave Learn about some projects focused on innovation within the aforementioned sector.
"Within the administration of Tamaulipas, 11 important projects in the energy field that will transform the state were specified. This consolidates us through the formation of the Secretariat of Energy Development, which by centralizing its services gives us the opportunity to promote many plans, including others with landing intentions ," he stated.
Regarding natural gas, before officials from states such as Campeche, legislators and guests, he showed the natural gas liquefaction plant of New Fortress Energy in collaboration with the CFE. It will allow hydrocarbons to be transported from Altamira to Texas, with 4.1 billion dollars, plus an onshore plan in that municipality.
"This is going to allow us to put ourselves on a par with the big projects that the country receives in the Pacific ," said the official.
He highlighted the Campo Brasil underground storage system and having energy in order to avoid what happened in 2021 when a frost left the supply without. It will make it possible to cover a national security strategy and at the same time it will place Mexico among the countries with the greatest management and development in terms of the aforementioned gas.
It is joined by the relocation of the Reynosa gas pipeline. From this matter, in two months the bidding for its new site will be launched and it contemplates receiving investments with this gas resource.
Another one is to have ready the so-called port of the North that will serve the oil companies with operations in the Gulf of Mexico, including Woodside in the Trión field. In addition, Nearshoring will allow it to be the first port close to the great market that is the United States.
"The entire master plan was modified to bring renewable energy projects closer to it, more conventions focused on other needs of both Texas and Louisiana, cabotage within the country and even being able to export to Europe and Africa. The advance is 15 percent hundred ," said Silva Arizabalo.
To strengthen the vulnerable areas of the state, a photovoltaic park will be built in Tula, it is the most marginalized in our entity but it is located an hour and a half from the capital of San Luis Potosí. The Welfare Gas Stations for fishermen will be encouraged to supply fuel, with Pemex the rescue plan for some Reynosa land is being prepared as a cultural park, while with the organizations Tamer 2050 and Puerto del Norte they will encourage private capital and the headquarters of the Mexican Petroleum Congress in 2024.
https://www.milenio.com/negocios/desarrollo-energetico-tamaulipas-promueve-11-proyectos-prioritarios
Lack of pipelines limits south-southeast Mexico's access to natural gas
https://www.dineroenimagen.com/empresas/falta-de-ductos-limita-acceso-del-sur-sureste-de-mexico-al-gas-natural/155845#google_vignette
Very interesting Livefree
What was his story and the dream teams? I don’t remember much about that except for the PR that was put out
The Navy has control of the Isthmus projects
I personally have no idea, others might