Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
SPARC AI selects Google’s Coral as preferred platform for embedding geospatial code into microchips
Military Drones Front and Center https://www.sparcai.co/investors EGTTF AKA SPAI in Canada target markets 375 billion
https://static1.squarespace.com/static/64a35575f2c81b7f74bb7d36/t/64d9c35a1e284e1bd9334661/1691992937981/SPARCAI_Presentation+2023.pdf
EGTTF - SPARC AI INC or SPAI in Canada watch for news Military Drone Demo coming soon
plus when they restructured last summer a 2.2 million dollar divvy was included .18 cents on 12.5 million shares today
Anoosh ManzooriAnoosh Manzoori
• 3rd+• 3rd+
Chief Executive Officer at Shape CapitalChief Executive Officer at Shape Capital
I can't believe we have been sitting on this technology for years and never saw this opportunity!
We have a major breakthrough with SPARC AI. The SPARC AI patented algorithms can be used as an internal on-board navigation system for autonomous drones.
The SPARC records the Location Points (Px) of a drone’s flight path. The drone can use these Location Points to find the shortest path back to base or fly direct to any Location Point using the SPARC reverse lookup algorithm.
Drones can also use the SPARC virtual triangulation algorithm to create an accurate flight path to a Location Point or any other points of interest.
Eliminating the need for GPS, satellite, lidar or image recognition technology is a major differentiator and game changer.
EGTTF - SPARC AI INC or SPAI in Canada = AI Intelligence look at this stuff ANY THOUGHTS IDEAS ????
https://www.sparcai.co/
Sparc AI completes development of mobile app
2024-04-04 13:06 ET - News Release
Shares issued 12,484,316
SPAI Close 2024-04-03 C$ 0.155
Mr. Anoosh Manzoori reports
SPARC AI COMPLETES A MAJOR MILESTONE WITH THE DEVELOPMENT OF A MOBILE APPLICATION
Sparc AI Inc. has provided an update on operations.
The productization of the Sparc AI (artificial intelligence) intellectual property is progressing. During the past month, the company completed the following development.
Mobile application implementation: A mobile application with essential camera functionality has been developed, enabling orientation toward points of interest and data retrieval. Features for capturing location data, including location, heading and tilt retrieval, have been implemented.
The development team is currently undertaking extensive testing. A process of fine-tuning the algorithms involves iterative steps, where the set-up is carefully configured to simulate real-world scenarios, particularly those involving heights. This iterative approach is necessary to ensure that the algorithms perform optimally under varying conditions and heights. However, due to the complexity of the algorithms and the iterative nature of the fine-tuning process, it is inherently time consuming. Each iteration involves adjustments, testing and analysis to gauge the algorithm's performance accurately. This meticulous approach is essential to achieving the desired accuracy and reliability in distance calculation and other functionalities.
Core library development: Progress is being made in developing a core library in Python, facilitating third party integration for seamless incorporation into devices such as drones and cameras. This library enables communication between the mobile application and external devices, enhancing data transmission and interaction. Fine-tuning of the core library is continuing to improve accuracy in distance calculation.
Firmware environment set-up: The development is working on the integration into the Sparc AI microchip. Utilizing the Debian Linux-based operating system named Mendel for Coral development boards ensures efficient running of Sparc AI algorithms. Compatible operating systems for chosen hardware platforms are being selected to optimize system performance.
Interface development: The company is working on establishing a robust serial communication interface to acquire camera feeds from various external third party devices. This interface acts as a vital bridge, enabling the transfer of raw camera data to be processed by microchips for precise distance and location approximation.
Sparc AI is also expecting to take delivery of the Coral microchip boards and Accelerator boards in the next couple of weeks.
The company looks forward to providing further updates to the market, including a demonstration of the Sparc mobile app.
EGTTF - SPARC AI INC or SPAI in Canada = AI Intelligence look at this stuff ANY THOUGHTS IDEAS ????
https://www.sparcai.co/
Sparc AI completes development of mobile app
2024-04-04 13:06 ET - News Release
Shares issued 12,484,316
SPAI Close 2024-04-03 C$ 0.155
Mr. Anoosh Manzoori reports
SPARC AI COMPLETES A MAJOR MILESTONE WITH THE DEVELOPMENT OF A MOBILE APPLICATION
Sparc AI Inc. has provided an update on operations.
The productization of the Sparc AI (artificial intelligence) intellectual property is progressing. During the past month, the company completed the following development.
Mobile application implementation: A mobile application with essential camera functionality has been developed, enabling orientation toward points of interest and data retrieval. Features for capturing location data, including location, heading and tilt retrieval, have been implemented.
The development team is currently undertaking extensive testing. A process of fine-tuning the algorithms involves iterative steps, where the set-up is carefully configured to simulate real-world scenarios, particularly those involving heights. This iterative approach is necessary to ensure that the algorithms perform optimally under varying conditions and heights. However, due to the complexity of the algorithms and the iterative nature of the fine-tuning process, it is inherently time consuming. Each iteration involves adjustments, testing and analysis to gauge the algorithm's performance accurately. This meticulous approach is essential to achieving the desired accuracy and reliability in distance calculation and other functionalities.
Core library development: Progress is being made in developing a core library in Python, facilitating third party integration for seamless incorporation into devices such as drones and cameras. This library enables communication between the mobile application and external devices, enhancing data transmission and interaction. Fine-tuning of the core library is continuing to improve accuracy in distance calculation.
Firmware environment set-up: The development is working on the integration into the Sparc AI microchip. Utilizing the Debian Linux-based operating system named Mendel for Coral development boards ensures efficient running of Sparc AI algorithms. Compatible operating systems for chosen hardware platforms are being selected to optimize system performance.
Interface development: The company is working on establishing a robust serial communication interface to acquire camera feeds from various external third party devices. This interface acts as a vital bridge, enabling the transfer of raw camera data to be processed by microchips for precise distance and location approximation.
Sparc AI is also expecting to take delivery of the Coral microchip boards and Accelerator boards in the next couple of weeks.
The company looks forward to providing further updates to the market, including a demonstration of the Sparc mobile app.
Northern Shield finds visible gold at Root & Cellar bedrock source high grade ginguro bands with visual gold
https://sjpb8d.p3cdn1.secureserver.net/wp-content/uploads/NRN-Press-Release-August-22_Final-_VG.pdf
2023-08-22 09:59 ET - News Release
Shares issued 80,034,091
NRN Close 2023-08-21 C$ 0.09
Mr. Ian Bliss reports
NORTHERN SHIELD IDENTIFIES VISIBLE GOLD IN OUTCROP AT ROOT & CELLAR PROJECT, NEWFOUNDLAND
Northern Shield Resources Inc. has provided an update on exploration at the Root & Cellar gold-tellurium-silver-copper project located near Marystown on the Burin peninsula, in southeastern Newfoundland. The company can earn a 100-per-cent interest in the project, which is being explored for epithermal gold-tellurium-silver and porphyry copper mineralization.
Visible gold has been identified in at least eight grab samples from a trenching program in the Conquest zone, with up to 20 flecks of gold noted under the microscope from a single sample. Visible gold is largely hosted in quartz-adularia veins in newly exposed parts of the outcrop in the southern Conquest zone. Northerly trending fractures crosscut the outcrop that lies within an east-trending structural zone. Both structural orientations are associated with pyrite mineralization and quartz veining. This trenched outcrop overlies a near-surface, easterly trending, IP (induced polarization) anomaly and the southern tip of a prominent northerly trending IP anomaly modelled at approximately 50 metres depth.
Intense silicification, and multiple phases of brecciation, pyritization and quartz veins, are common characteristics, with some veins with classic colloform-crustiform banding indicative of low sulphidation epithermal systems.
Based on the ice direction and significant differences in textures and vein compositions, the trenched Conquest outcrop is not the source of three large boulders with visible gold previously found approximately 350 metres to the east of the trenched location (see company news releases dated Sept. 7, 2022, Dec. 15, 2022, and Feb. 21, 2023). The source for those previously discovered boulders has yet to be found, and will be targeted by further trenching and the up-coming drilling program.
"We are happy with results from last week's field program: firstly, the discovery of visible gold in bedrock from multiple samples, with some associated with quartz-adularia veinlets; secondly, the identification of some quite striking crustiform-colloform-banded quartz veins; and thirdly, the confirmation of structural trends believed to control mineralization, and their spatial correlation with a deeper, north-trending IP anomaly, interpreted to be the feeder for the mineralization. In addition, the source of visible-gold-bearing boulders, found to the east, remains to be found," stated Ian Bliss, president and chief executive officer.
The contents of this press release have been reviewed and approved by Christine Vaillancourt, PGeo, and the company's chief geologist, who is a qualified person as defined under National Instrument 43-101 -- Standards of Disclosure for Mineral Projects.
About Northern Shield Resources Inc.
Northern Shield Resources is a Canadian-based company, known as a leader in generating high-quality exploration targets, that views greenfield exploration as an opportunity to discover a near-surface Tier 1 asset at relatively low cost. The company implements a model-driven approach in exploration to reduce risks associated with early-stage projects for the company, its shareholders and the environment. This approach is what led to the discovery of an alkaline-related gold-silver-tellurium-porphyry-copper system at the Root & Cellar project in Newfoundland.
We seek Safe Harbor.
2 more discovery junior stocks 1 is nickel close by voisey bay mine the other is sedi copper discovery both in Canada
BAY = Sedi Copper discovery
AVA = nickel discovery by Voisey Bay mine = 28 mil shares FD pp last was 15 cents closed today .11
dyodd this time around both will be big screamers
VRR core photos compared to 30,000 diamonds in 10.5 grams of rock
$VRR hole 2 compared to 30,000 diamonds https://t.co/xEPEh88AfZ pic.twitter.com/hOjRxwAYaF
— Rocketred (@wildcat2013) July 21, 2023
@HRA-Coffin Hole 3 still underway but should be done in a day or two. They are being careful after the problems with hole 2, but making good production and recoveries. Probably see a "hole done" release late this week. $VRR
400 to 500 metres into the kimberlite pipe its a monster in Ontario and this is the biggest discovery in Canada at 120 hectares BIG
VRRCF VRR 3rd hole in progress going to be a deep deep one into Kimberlite Pipe 1.2kms in size = MONSTER In Ontario and could be the biggest Kimberlite field discovered in Canada and the World
20 more targets that a huge 600 to 1000 metres in diameter
Diamonds Surround Norhway from North to South and West to East
BUY for a 100 bagger
VRRCF or VRR
VRR or VRRCF 1 carat diamond
VRRCF or VRR 3rd hole going into Kimberlite pipe
should clue ya in the drill core is hot
expert diamond person with many written papers on diamonds say the the photo shots on holes 1 and 2 look very good
this could be the biggest discovery in the world stay tuned in
grab a little it does cost much
ORIGINAL: VR Provides Exploration Update for Ontario and Nevada Properties
2023-06-01 07:31 ET - News Release
VRR Close 2023-05-31 C$ 0.21
(via TheNewswire)
Click Image To View Full Size
Click Image To View Full Size
June 1, 2023 – TheNewswire - Vancouver, B.C.: VR Resources Ltd. (TSXV:VRR) , ( FSE:5VR) ; ( OTC:VRRCF ), the "Company ", or “VR ”, is pleased to provide the following update on its exploration activities:
Three drill holes completed for 1,035 metres in three different areas of REE critical metal mineralization at its Hecla-Kilmer project in northern Ontario. Geochemical data are expected later this summer. The metallurgy and beneficiation study on dedicated drill core from Hole 013 is also underway, and results are also expected by late summer.
The Company plans to return to the nearby Northway kimberlite discovery for the completion of an additional drill hole prior to demobilizing the H-K drill program.
Completion of two state-of-the-art geophysical surveys on the large-footprint, copper-moly-silver porphyry system at its New Boston property in Nevada.
New Boston
The successful close of the $1.9m financing last month provided the funds to complete two high-tech geophysical surveys at New Boston. The goal is to identify specific targets for drill testing the high temperature, sulfide core of the polymetallic, stockwork and sheeted vein system exposed at surface over a 4 km strike length. The Company is currently working with fully processed data and final plan maps from both surveys, and expects to report integrated results from 3D inversion models soon.
Figure 1 . Field panoramic photo spanning the 4 km strike length of sheeted and stockwork porphyry veins exposed at surface with copper, molybdenum and silver.
Figure 2 . Satellite image of airborne magnetic and radiometric survey over a 3 x 5 km area. Precision GeoSurveys Inc . was contracted to conduct a high-resolution survey using its exclusive, multi-sensor technology and three-boom design to collect gradient magnetic data in real time for enhanced subsurface interpretations in three dimensions, in addition to collecting VLF-EM and radiometric data.
Figure 3 . Satellite image showing the ground-based 3D IP geophysical survey over a 1.6 x 2.2 km block covering the core of the porphyry system. DIAS Geophysical Limited was contracted to complete the survey using its DIAS32 DCIP technology and grid array of receiver stations with real time radio frequency data collection. The survey generated more than 80,000 data points for inversion modeling and resultant 3D models of chargeability and resistivity.
From VR’s CEO, Dr. Michael Gunning, “ The drilling at Hecla-Kilmer went as planned, and our current goal is to get the drill back to Northway for an additional hole into the kimberlite breccia complex before we demobilize the spring drill program. That said, the purpose of this news release is also to remind our shareholders that we have not lost sight of the upside potential of our porphyry copper assets in Nevada.
Surface work and reconnaissance drilling by Conoco, Gulf and Bear Creek at New Boston in the 1960s and 70s clearly established the scale of the system, but a sector collapse in 1981 left that work unfinished with regard to identifying and drilling a central porphyry stock for the system of sheeted veins exposed at surface. The opportunity for VR is simply to finish the work that was started by Conoco, with the advantage of modern geophysical technologies. Our ultimate goal is two-fold:
1. Identify and drill test the sulfide core of the system, and;
2. Confirm with modern ICP geochemical techniques the polymetallic grade potential for copper and silver at New Boston, in addition to its known, world-class grades in moly.
I would like to thank both Precision and DIAS for making room in their schedules for our surveys this spring. We have worked with both companies on numerous previous surveys, and we look forward to re-visiting what their respective technologies and modeling expertise can bring to the table to advance our understanding of New Boston towards drilling and discovering the center of the large porphyry system.
Technical Information
Summary technical and geological information for the Company’s various exploration properties including New Boston is available at the Company’s website at www.vrr.ca .
Technical information for this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101. Justin Daley, P.Geo., VP Exploration and a non-independent Qualified Person oversees and/or participates in all aspects of the Company’s mineral exploration projects, and the content of this news release has been reviewed on behalf of the Company by the CEO, Dr. Michael Gunning, P.Geo., a non-independent Qualified Person.
About the New Boston Property
Location
New Boston is within the Walker Lane mineral belt and structural province in west-central Nevada. More specifically, it is within the co-spatial belts of Jurassic and Cretaceous aged copper and moly porphyry deposits, including the Yerington camp and Hall deposit.
New Boston is located in the Garfield Range in Mineral County, approximately 150 km southeast of Reno. Vegetation is sparse in the range; outcrop or colluvium predominate on the property itself, with quaternary cover developed off its eastern border and eastern flank of the range.
The property location facilitates cost-effective exploration, year-round. Access is from the nearby town of Luning located just 5 km to the east on State Highway 95 connecting Reno and Las Vegas. The property itself is criss-crossed by a myriad of active, historic trails and roads which are reachable from the highway.
Property Description
The New Boston property is large. It consists of 77 claims in one contiguous block approximately 3 x 5 km in size and covering 583 hectares in total (1,441 acres). It covers the entire extent of the known copper-moly-silver porphyry-skarn mineral system exposed on surface between Blue Ribbon and East Zone, and its inferred down-dip potential to the north.
The property is on federal land administered by the Bureau of Land Management (BLM). There are no state or federal land use designations, or privately-owned land which impedes access to, or exploration on the property, nor is the property within the BLM’s broadly defined area of sage grouse protection.
The property is owned 100% by VR. There are no underlying annual lease payments to previous owners, nor are there any joint venture or back-in interests. There is an industry-standard royalty attached to the property, including a buy-back provision to VR.
About VR Resources
VR is an established junior exploration company focused on greenfields opportunities in copper, gold and critical metals (TSX.V: VRR; Frankfurt: 5VR; OTCQB: VRRCF). VR is the continuance of 4 years of active exploration in Nevada by a Vancouver-based private company. The foundation of VR is the diverse experience and proven track record of its Board in early-stage exploration, discovery and M&A. The Company focuses on underexplored, large-footprint mineral systems in the western United States and Canada, and is well-financed for its mineral exploration and corporate obligations. VR owns its properties outright and evaluates new opportunities on an ongoing basis, whether by staking or acquisition .
ON BEHALF OF THE BOARD OF DIRECTORS :
“Michael H. Gunning”
____________________________
Dr. Michael H. Gunning, PhD, PGeo
President & CEO
For general information please use the following:
Website: www.vrr.ca
Email: info@vrr.ca
Phone: 604-262-1104
Forward Looking Statements
This press release contains forward-looking statements. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions or those which, by their nature, refer to future events. Forward looking statements in this release include those related to the companies upcoming plans, such as “ identify and drill test the sulfide core of the system”, and “VR evaluates new opportunities on an ongoing basis.”
This news release may contain statements and/or information with respect to mineral properties and/or deposits which are adjacent to and/or potentially similar to the Company’s mineral properties, but which the Company has no interest in nor rights to explore. Readers are cautioned that mineral deposits on similar properties are not necessarily indicative of mineral deposits on the Company’s properties.
Although the Company believes that the use of such statements is reasonable, there can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future performance, and that actual results may differ materially from those in forward-looking statements. Trading in the securities of the Company should be considered highly speculative. All of the Company’s public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in Policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
/
Click Image To View Full Size
Figure 1 . Panoramic photo from the field by VR in 2017. The potential of New Boston is about scale, and location. Sheeted veins with copper, molybdenum and silver are exposed on surface over a strike length of approximately 4 km across the skarn and porphyry system. It is located less that 5 km from Highway 95 connecting Reno and Las Vegas in west-central Nevada. Historic drill intersections from internal Company reports.
Click Image To View Full Size
Figure 2 . Outline of airborne magnetic – VLF-EM – radiometric survey conducted over the polymetallic skarn and porphyry system at New Boston property by Precision Geophysics, 2023. Survey design on the 3 x 5 km block for high resolution data includes 75 m line-spacing and completion of 8 additional tie lines for 241 line-kms in total, with an average flight altitude maintained at just 35 metres above ground.
Click Image To View Full Size
Figure 3 . Outline of ground-based 3D IP geophysical survey conducted over the core of the polymetallic skarn and porphyry system at New Boston property by DIAS Geophysical Limited, 2023. The survey block is 1.6 x 2.2 km in size, with an equant grid array of 200 metre-spaced receiver and transmitter stations for real time data collection and generation of more than 80,000 data points for resultant 3D inversion models.
Copyright (c) 2023 TheNewswire - All rights reserved.
VRRCF or VRR = Must own rags to riches 20 cents today will it be a 50 to 100 dollar stock DISCOVERY ?
your next aru type stock
President already had 2 takeover deals in the Sask Uranium
$VRRCF $VRR ERIC COFFIN target potential 50 billion for 1 kimberlite pipe
https://twitter.com/i/spaces/1rmxPkeRojjJN
Eric talked a good 10+ minutes toward the end of this chat on friday.
https://twitter.com/i/spaces/1rmxPkeRojjJN
While worth a listen.
"not for the feint at heart"
"Fantasize.....$50 billion"
EKIM
PS 20 plus more big targets to also drill as Kimberlite pipes come in clusters
VRR or VRRCF northway 300 acre kimberlite pipe = The 1 carat diamond at Coral Rapids was found somewhere around that big bend in Abitibi River north of Otter Rapids and about 15 to 20 km southeast of Northway.
VRR lets see if it the BIGGEST IN THE WORLD = DIAMONDS
Dia-met 10 cents to 70 dollars
ABER pennies to 50 dollars
diamond mines by diamet and aber where 100 metres to 150 metres pipes
vrr northway 1.2kms in diameter = staked 20 more 500 to 800 metre targets in the area of Ontario
core photos look very hot all the right stuff confirmed for diamonds
hole 1 = https://vrr.s3.amazonaws.com/news/February2023/u2LJZxFnBopLT6KbyL6n.pdf
hole 2 = https://vrr.s3.amazonaws.com/news/May2023/ivUVzLfREIuEyjH1O1RR.pdf
Avenue Therapeutics initiated by Aegis at buy. $32.00 PT. $ATXI
GET YOUR CHEAP SHARES before they are gone for APRIL ATXI
APRIL 2023 FDA approval = The FDA stated that the proposed study design appears reasonable and agreed on various study design aspects with the expectation that additional feedback would be provided to Avenue upon review of a more detailed study protocol.
Advance Lithium Enters Discussions with Mexico's National Lithium Company LitioMx to Form a Joint Venture
https://finance.yahoo.com/news/advance-lithium-enters-discussions-mexicos-164900467.html
NILI or NILIF 12 cents today 100 billion plus in Lithium in nothern Nevada? not far from Lac's (35,00 per share price )Thacker Pass lithium deposit has a grade of 3000ppm
2 beds 1700 metres by 300 to 400 metres wide
already drilled down 160 metres
stock price close today .12 cents
rags to riches
assays pending and most likely out next week sometime
nili has 4500ppm grades already from drill hole 1
SURGE BATTERY METALS CONFIRMS HIGH GRADE LITHIUM DISCOVERY IN FIRST DRILL HOLE AT NEVADA NORTH PROJECT
The first hole of an eight-hole reverse circulation drill program has confirmed the potential for a high-grade lithium deposit existing at Surge Battery Metals Inc.'s Nevada North lithium project located north of Wells, Nev.
Six representative and randomly selected samples of silty clay, taken from varying depths in drill hole NN22-01, range from a low of 1,790 parts per million to a high of 4,500 ppm lithium (average 3,093 ppm lithium). Full drill results will be announced once received from the lab, expected in two to three weeks.
Lithium sample results vertical drill hole NN22-01, total depth of 82.3 metres (270 feet):
3,170 ppm from three m to 4.6 m (10 ft to 15 ft); tan clay with fine tuff sand;
4,500 ppm from 9.1 m to 10.7 m (30 ft to 35 ft); blue-green silty clay;
1,790 ppm from 16.8 m to 18.3 m (55 ft to 60 ft); blue-green silty clay;
1,990 ppm from 59.5 m to 61 m (195 ft to 200 ft); dark blue-grey silty clay;
2,980 ppm from 61 m to 62.5 m (200 ft to 205 ft); dark blue-grey silty clay;
4,130 ppm from 62.5 m to 64 m (205 ft to 210 ft); dark blue-grey silty clay.
Initial results from drill hole NN22-01 confirm that significant surface lithium soil values of up to 5,120 ppm lithium also continue to a depth of over 64 m (200 ft). Drilling in all holes encountered similar silty clay units ranging in drilled depths of up to 91.5 m (300 ft) in most holes and up to a depth of 160 m (525 ft) in drill hole NN22-07.
The maiden drilling program was implemented to test an area of about 1,700 metres east-west occurring in two bands, each about 300 to 400 metres wide, that outlined a highly anomalous zone containing abundant sample points greater than 1,000 ppm lithium.
Greg Reimer, company president and chief executive officer, states: "The initial drill sample results have confirmed that highly anomalous lithium values persist to depth in the silty clay unit that appears to underlie the better soil values observed in samples collected last year and earlier this summer.
"Our maiden drilling program has identified significant potential for a lithium deposit in an area of northern Nevada not previously recognized for its lithium potential. We look forward to seeing the completed assay results from the eight-hole program as they are received over the next few weeks. The company plans to continue work at this exciting new discovery in the months ahead and we are well financed to do so."
Drilling utilized a buggy-mounted system provided by O'Keefe Drilling Company of Butte, Mont. Site preparation and water handling were provided by Legarza Exploration of Elko, Nev. Drill cuttings were collected on five-foot intervals and bagged at the drill site by O'Keefe staff. Samples were collected from the site by the Surge project geologist and delivered to the ALS Global sample preparation facility in Twin Falls, Idaho. Samples were dried, crushed and pulverized at the Twin Falls facility and sent to other ALS laboratories for analysis. Samples were assayed using the ALS ICP-41 method using an aqua regia leach followed by inductively coupled plasma optical emission spectrography. The detection level of lithium by this method is 10 to 10,000 ppm. Complete results are pending.
GOCOF or GOCO President Podcast yesterday after close
RUSH ASSAYS NO PP deals
Get a ticket for the next Diamond Fields in southern Quebec
DFR hit 160.oo per share on a inci buyout 30 years ago
GOCO 20.5 million shares issued
Listen to the interview BOOM coming on rush assays
https://podcasts.google.com/feed/aHR0cHM6Ly9hbmNob3IuZm0vcy81M2NlZWU4L3BvZGNhc3QvcnNz/episode/ZGU0ZmFjMDItMGZhMi00NzBhLTk0OWEtY2JmMTk3ZTZmOWJh?ep=14
ok will do
lots of jobs here
DISCOVERY FUND out of EUROPE just posted this on GOCO
Discovery Fund just bought 1.8 million shares last few trading days with Morgan Stanley
@discoveries After doing some more research on the GOCO discovery I dare to say the only thing missing in an Ovoid type chamber of massive sulphides ?? .. all the rest is looking fairly similar to the early Voisey Bay results. The only difference, GoMetals is finding mineralized zones over a 3x6 km area, while the initial prospective VB zones were much smaller. Even more impressive, almost ALL prospectives zones (conductors) have already been proven to be mineralized with sulphides, starting almost always from outcropping zones from surface. This is an incredible large and strong system imho. Assays will probably confirm the initial grab sample results, so up to 4% copper and 2% nickel. The initial VB grab results were up to 6% Cu and 3% Ni. Mineralisation at VB is connected to Pyrrhotite, pentlandite and chalcopyrite, all present in the $GOCO system as well. As said the only thing missing, is a massive sulphide core a la the Ovoid (the richest and most valuable part of course). However given the massive size and strength of this system it might be somewhere. It was found at VB only 1 year after the initial discovery. Still can’t believe the risk/reward situation here .. market cap this less then 20 mln. Remember VB was sold for almost $4 bln in 1996. In today’s money 10bln+. GoMetals has much more good infrastructure relatively nearby. Railway 50km away, while power is relatively nearby as well. Succes is NOT guaranteed, however this is the single most intriguing 2023 discovery in our portfolio. So, yes we are #long 3 from @discoveries, 23 minutes ago
GOCO GOCOF Voisey Bay #2 Nickel Discovery ? massive sulphides over metres
Brand New Discovery in Quebec Grassroots exploration 5 targets drilled all hit over an area of 3kms by 8kms
DFR voisey sold for 160.00 per share in 1996
https://gometals.ca/news/SEP13_2022.pdf
https://gometals.ca/drill-observations.pdf
lets us know how much money you lose in this scam
APDN News on Monkey Pox was to get money 14 mil shares 14 mil warrants at 70 cents
this is going to tank
Look at the history of this conpany
sec halted it 27 times yesterday as warnings
going red
lol lets see when you guys all bail out before close today
lots of people will become the new bag holders of apdn 70 cent financing = timber
some are blind so let them lose there money
70 cents pp deal already announced in FILINGS AUG 2 stock crash is coming
https://finance.yahoo.com/sec-filing/APDN/0001104659-22-084740_744452
Its called a huge P & D with 70 cent financing coming any day
lots are going to get burnt
Restructures - APDN
Date Old Symbol Old Shares New Symbol New Shares
2019-11-01 APDN 40 APDN 1
2014-11-17 APDND 1 APDN 1
2014-10-29 APDN 60 APDND 1
2004-05-24 APDNE 1 APDN 1
2004-05-21 APDN 1 APDNE 1
2003-11-28 APDNE 1 APDN 1
2003-11-26 APDN 1 APDNE 1
2003-05-23 APDN** 1 APDN 1
tis will crash as soon as its effective