is enjoying the weather
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Right hand chart on the slide titled "Improved temporal stability of Vpi @ 85°C"
Noteworthy in that it is the last graph and slide before the road map update. They made a poo sandwich if you will. Good stuff, bad stuff, Good stuff.
I do not think I am wrong on this, I want to be wrong as it will loose me money.
Reminds me of replacing lead acid batteries with SAFT. The charge constants were different and existing plant not designed for the increased load. Oh, ignore the chart, the sales chick is a hotty. 3 years later and much addition cost, yup, should have paid attention to the charts..
Sorry,. I do have a very firm idea of what a "Tier 1" does with optics and what increasing power consumption means. It means that after you hit x hours the voltage required to drive the proper levels will exceed that of a cmos and a driver will be required. I would love to see a 3k hour chart.
Keep in mind once deployed an optical transmitter runs continuously for years if not decades. 83 days, 166 days or even 360 days need to show stability.
The industry is not looking for top fuel dragsters that are going to grenade after a run, they are looking for over the road tractors that require no time in the shop.
Not a scam. Possibly a swing and miss. Testing and tweaking,. Maybe they are one change away from a stable transmitter. I suspect they are not there yet. If it was a scam they would not even be attempting to fix it. The tech may not be a dead end....
If I am wrong I hope the company puts out supplimental information to assuage my fears.
A little troubled by graph 2 on slide 46. It shows power usage increasing aft just 83 days of use.
We may have our answer.
We sit wait for news
Life hinge better get the booze
Drink for delayed soon
Classic, at least he responded unlike some other companies.
I do not short. Something may happen here,. I just do not think this week. Had hopes but those be fading.
As to CCTC. Either we are about to make bank in the next few weeks or it is done. Is the spinning the roulette wheel or around the drain, we will see.
I smell the stale aroma of a huge nothing-burger floating on the breeze..... Look at that volume today on all the big news...... exactly........
Let us hope all this spit balling remains just that, uninformed idle speculation that has no bearing on reality.
Cartman, thank you for sharing the information about your call.
Suspect we may now know where the rotary asborbtion kiln idea came from. Would not be surprised if they took over manufacturing and operations from Keiwit. Just hoping they are not a legal manipulation to get away from CCTC being publicly traded.
Looking at Eve's publicly posted schedule he has "sweep dust off slab" posted for 3 hours Friday afternoon. He is all about saving share holder dollars that one ..
Not many sellers down below a dime...
I emailed CCTC Sunday and asked them if there is a relationship. As a share holder it would be good to know. Waiting for a reply....
https://www.thermosolv.com/
Should make an interesting quarterly report upcoming.
We have to see how this next month goes.
Hoping for a run that will allow a myself to cash out and keep playing with house money.
I hope this is the case...
I agree with you. Missed opportunity ,
This would be nice.
"In the fifth funding opportunity award, three projects were selected to receive up to $15 million under DE-FOA-0002003, Process Scale-Up and Optimization/Efficiency Improvements for Rare Earth Elements (REE) and Critical Materials (CM) Recovery from United States Coal-Based Resources. The selected projects will support DOE’s Feasibility of Recovering REEs program and will advance technology development for recovery of REE and CM from domestic coal-based resources via conventional extraction, separation, and recovery processes"
https://www.energy.gov/articles/us-department-energy-invests-56-million-coal-technology-projects
I think the moisture content of Eastern coal is lower and would give diminished returns.
To be fair, the only ones that have made money from CCTC being in the coal cleaning business are Eves, Nearly an people who play the market. Maybe REE will actually show dividends.
Link no work.
Figure the odds of $.105 before photos of the new plant. All will be forgiven if we hit $1.50
One would think that.
I guess the point could be made that I should not rant in ignorance, however, I see very little reason to sit be optimistic anything positive is in the works.
Truth is probably in the middle but success seems elusive at best. Sadly there is no news.
Up to 181 million shares outstanding. The boys are diluting the crap out of this thing to scratch together matching funds. Meanwhile their sorry selves reside in tax heavy Connecticut and not were the work actually needs to get done. I would not be shocked if they had kept the HQ in Florida or some such they would have saved enough in payroll taxes to match a significant portion of the the grants.
I am sure the diluting was anticipating the paid pump doing more.
Fail theater this.
Grifters...
At this point any real news would be welcome.
Soon. Look at that volume......eh... Maybe not.
Earth, Martian or Neptunian year?
Yes, you are pretty close to the mark. Lack of project manager is not really a thing but lack of test plant 2 or any substantive movement is. Why spend $25k at all, it just seems a stupid waste of company money. Along the lines of putting expensive chrome spinner rims and rubber on a Tercel sitting in your driveway with a blown head gasket.
My only thought is maybe the 25k is for PR thru assembly and signing of the first contracts and assembly is imminent and the PR is a ramp up. Still piss poor timing if so and indicative of poor management, best to hold your powder and keep it dry for a few weeks.
Of course at this point I suspect no test plant this year or possibly ever. Hope I am wrong.
$25k of money blown out the companies ass on filler fluff. They would have done better to hire a project manager to oversee test plant assembly for 3 months using that cash and touting that.
Horse shit.
Letting it ride... The only ones that can help this company are the employees, this is beyond the dealing of a message board. Either the gears are moving out of view or they are not. We shall see, share price will reflect earning potential in the future just as it does currently. Hoping for a good Autumn.
Their best men are on the case.... Best men...
Outstanding!
Well tommorow is another day. And Taco Tuesday to boot.
Will there be a Earths battering event involving clean coal this week?
Magic 8 ball says "Highly unlikely"
Most assuredly.
I feel ill.
Bought a few just so I can see what could have been if I was not harnessed to CCTC.
Underwhelming letter today.