Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Michael the bankrupt scammer?
He drives a really big gas guzzling truck that I dont think he would give up for what you have posted. So if he drives, we're going to have a large fuel bill, one that might match the otherwise outrageous last minute flight bills that have amassed over the years. When Mexico calls, you do what they tell you, and, you don't charge them, you amass expenses for years that you pass onto shareholders in the form of private placement, toxic notes, and the like, but eventually they give you the deal. It's called relationships.
Theres many many many sources of information. Your posts seem to indicate similar.
I dont know about the crabs, but there was a volcano eruption 40 mil from Mexico City that jeopardized flights to CDMX due to visibility, luckily Michael was able to make it.
So you get inside info?
I heard the crabs were a problem in Mexico
On a positive point, I am hearing things are going very well for us in Mexico this week. Should we expect less? Sometimes a lot less actually. So take that as a positive, and knock on wood or whatever hard substance worth knocking on.
You couldnt be more correct on that point.
And there is nobody that I know or don't know that will defend that, nobody. Many investors have gotten themselves to get past that or will do so once trading is fully open to all brokerages, and it's maybe even possible that some never get past that regardless of any successes that might come in the future (especially if they managed to sell out of their position before Mirage takes off). I've heard stories of people losing relationships with loved ones over this stock, it seems a bit much, but that's what I have heard, and maybe that is just part of life I don't know.
People can be very emotional about investments. My wife wanted nothing to do with my even mentioning Mirage the last year. Now she asks about the price every couple days. It drives me crazy. No concept of long term investment in penny stock, meanwhile its ok to put all your money in index fund and that its going to make you money in long run - true - but you can lose a huge amount in a couple years which I anticipate is going to happen with this market (my opinion of course)
Being unable to trade this chit is not shareholder friendly. He stiffed lots of shareholders
He sure is not vendor friendly, he stiffed people for millions in Dimmit County and took Bankruptcy
Yes,definitely back in Mexico.. a very shareholder friendly CEO
Cenagas is speaking a lot today about future nat gas projects they are going to be working on..It maybe worth following their feed.. Something is brewing..IMO
Good time to sell while it is up. This chit will tank as it always does
I was hoping for some cheap shares at the open like yesterday but looks like bid is moving up.
Could be days away...
More straight gold bullshit. Mexican media misCONstruction.Joins the endless list of useless Mexican media articles posted here over the years that cumulatively meant nuffin.
Good for chuckles only.
My issue with this is that my understanding is they dont have a much of a source of gas from the southeast, and the whole point of the San Fernando-Cactus line was to reverse direction from south ->north to north->south to bring gas southward. I feel like its a typo.
It kills me, in one hour with Ward we could all get the answers to all of these questions and more without necessarily giving us inside information meanwhile we're stuck reverse engineering everything we read, it's exhausting but if using our mind analytically is preventative for dementia, then we're doing ourselves good
More straight gold bullshit.
Good for chuckles only.
Distribution of natural gas should increase more than 120% through Corredor del Istmo
https://www.eleconomista.com.mx/empresas/Distribucion-de-gas-natural-debera-incrementar-mas-de-120-por-Corredor-del-Istmo-20230607-0140.html
Great interpretation, that makes sense ...natural gas guaranteed by Mirage's project ...WOW
So,it gets there via the cactus line?
Yes, Macod and I were just talking about this. Now that I look at it again, one possible interpretation of it is that it should be split up into two separate sentences as such:
"The natural gas that will supply this project will not be imported, but national, it would come from the southeast of the country."
"Mainly from the Burgos field in Tamaulipas and other fields, the supply will be guaranteed."
This lines up with this quote from an article Macod just posted - https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172085014
“Now with the increase in production in the southeast and with the demand, which is part of this exercise that we are doing, well, we have to start looking at other schemes, because it would no longer be enough to store in the pipeline, they will already be required, other support systems to be able to continue guaranteeing the gas supply”, he pointed out.
I think it's saying that the natural gas will be produced in the southeast, but the storage in Tamaulipas will guarantee the supply. "Storage systems are required, because in colloquial terms it is like having a road and not having parking." We would provide the "parking." (I love that quote as well.)
Ward is 67 but I don't see how that matters. We all know he will very likely sell the projects anyway
Can you clarify this quote
"We also cannot invest a lot of money in storage infrastructure, since it would be reflected in a higher tariff, we must do it gradually, otherwise, it would generate a problem," he said
Is the Brasil field not a 2 billion dollar project..Is He inferring Mexico cant invest in it, but an outside entity can? WARD IS IN HIS SEVENTIES .how much time and energy does he have left.. That line left me a bit confused..thanks MM
Wow if that article doesn't say it ALL!
"The natural gas that will supply this project will not be imported, but national, it would come from the southeast of the country, mainly from the Burgos field in Tamaulipas and other fields, the supply will be guaranteed," he said.
From Mirage 10Q:
The Projects which will be initially developed include:
Mirage 1 - Burgos Hub Storage & amp; Gas Pipeline
I think the following is a typo "It would come from the southeast of the country, mainly from the Burgos field in Tamaulipas and other fields," since Tamaulipas is in the Northeast not Southeast
Pemex won! It will supply natural gas to industrial parks of the Trans-Isthmus Corridor
Cenegas announced that the natural gas that will be used in the Trans-Isthmus Corridor project will be national and not exported.
The poles that will demand more natural gas are those of Ciudad Ixtepec and Santa María Mixtequilla.
By Hector Usla
June 07, 2023 | 16:20 pm hrs
The welfare development poles, one of the last priority projects of President Andrés Manuel López Obrador, will require a demand of 11.31 million cubic feet per day (MMcfd) of natural gas, and its supplier will be PEMEX Industrial Transformation, Abraham David Alipi Mena, general director of the National Center for Natural Gas Control (CENAGAS), said in an interview.
"The natural gas that will supply this project will not be imported, but national, it would come from the southeast of the country, mainly from the Burgos field in Tamaulipas and other fields, the supply will be guaranteed," he said.
The development poles are made up of 10 industrial parks that will enjoy fiscal and non-fiscal incentives to install industries that generate value, so they intend to be one of the pillars to detonate the development of certain regions of the southeast of the country. This project is part of the Trans-Isthmus Corridor.
The spaces that will demand more natural gas are those of Ciudad Ixtepec and Santa María Mixtequilla, with 1.5 MMcfd, both located a few kilometers from the capital of Oaxaca.
The executive said that the companies that seek to settle in these 10 industrial parks have different vocations, such as electronics, semiconductors, automotive, auto parts, transportation equipment, medical devices, metals and petrochemicals, among others.
Aldo Silva Cortés, general coordinator of planning and design of strategies for the development of the Trans-Isthmus Corridor, explained that since June 5, the guidelines that companies interested in participating in these tenders must follow were published.
Companies that manage to win a tender could obtain discounts of between 50 and 100 percent of the VAT, as well as various tax benefits.
Initially, the concessions could be given for two years, with a possibility of extension of five years.
"They will think that it is a short time, but what we are looking for is that the participants establish an investment proposal for that period, and if they comply with it, the idea is that the property is sold to them at present value," he said.
The first public tender will be held at the end of June 2023, while the failure of the first tender and a second public tender will take place in October 2023. The ruling of the second public tender will be in February 2024.
The first tender will be integrated by the industrial parks Coatzacoalcos I and II, Texistepec, San Juan Evangelista, San Blas Atempa and Salina Cruz, while in the second tender will be the parks of Matías Romero, Asunción Ixtaltepec, Ciudad Ixtepec and Santa María Mixtequilla.
Regarding the Interoceanic Corridor of the Isthmus of Tehuantepec, it was reported that the 'backbone' of the railway project called 'Line Z', already presents an advance of 78 percent, and is expected to be completed in August 2023. This section consists of 227 km of roads, 82 bridges, 290 drainage works, which required an investment of 19 billion pesos.
The 'FA and K Line' developments are still pending, these are expected to be completed during the first quarter of 2024 and the fourth quarter of 2024, respectively.
They go for seven days of storage
On the other hand, the general director of CENAGAS said that they will seek that the storage of natural gas in the country reaches seven days, since currently, storage ranges from 2.5-3 days.
"Japan has 90 days of storage, but they are not gas producers like Mexico, so our storage needs are different, anyway, we follow the initiative of President López Obrador to have energy sovereignty," he explained.
He explained that seven days could be more than enough for a country like Mexico, since the last natural gas crises that the country suffered lasted, maximum, five days, as was the case of the Texas frosts in February 2021.
"We also cannot invest a lot of money in storage infrastructure, since it would be reflected in a higher tariff, we must do it gradually, otherwise, it would generate a problem," he said.
https://www.elfinanciero.com.mx/economia/2023/06/07/pemex-salio-ganon-abastecera-de-gas-natural-a-parques-industriales-de-corredor-transistmico/
Surely we are further along than the review process? The whole thing has been reviewed, rereviewed, then reviewed again? Anyway, maybe we will become pink current today..$$$$gomrge$$$$
Will be great to see AMLO tout is pet Isthmus project next week
Mexico to launch tender for 10 industrial parks in 15 days
Reuters
May 29, 2023 12:19 PM EDTUpdated 10 days ago
MEXICO CITY, May 29 (Reuters) - Mexico will in 15 days launch a public tender for the construction of 10 industrial parks at a planned business corridor on an isthmus in the south of the country, President Andres Manuel Lopez Obrador said on Monday.
Auto makers, tech companies and semiconductor producers could be among investors in the parks, Economy Minister Raquel Buenrostro said this month, noting officials were pitching the project to companies from the U.S., Canada, Taiwan and Germany.
https://www.reuters.com/world/americas/mexico-launch-tender-10-industrial-parks-15-days-2023-05-29/
The Isthmus Interoceanic Corridor will require millions of cubic feet of natural gas
Alejandro Alegría
The 10 industrial parks that will be installed in the Interoceanic Corridor of the Isthmus of Tehuantepec will require more than 11 million cubic feet of natural gas per day, which will be transported through the pipeline owned by Cenagas.
Mexico City. The 10 industrial parks that will be installed in the Interoceanic Corridor of the Isthmus of Tehuantepec (CIIT) will require more than 11 million cubic feet of natural gas per day, which will be transported through the pipeline owned by the National Gas Control Center of Mexico (Swamps).
In an interview with La Jornada within the framework of the Cenagas consultative forum, Abraham David Alipi Mena, general director of the organization in charge of managing the energy transport and storage network in the country, commented that almost five years after the current administration "the The system has become more efficient because we have not had to go out to auction gas, buy gas, to balance the system”.
Aldo Silva Cortés, general coordinator of Planning and Design of Development Strategies at CIIT, commented that the first estimates of demand required for the Well-being Development Poles indicate that it will be 11.31 million cubic feet per day.
Data from the Corridor indicate that in synergy with Petróleos Mexicanos (Pemex) Industrial Transformation, it is expected to provide molecules to the industries that are established in the 10 industrial parks.
Alipi Mena told La Jornada that Cenagas is not the supplier of the molecule, because it is not the owner, but it is the operator of the 12-inch pipeline that runs through Coatzacoalcos and connects both the Minatitlán refinery with the Salina refinery. Cross.
“The 10 parks are located on that line, which means those parks will have a connection to the main gas line to have a fuel supply,” he said.
The agency's director indicated that "the system has been balancing in a very excellent way" in the almost five years of the current administration. “However, storage systems are required, because in colloquial terms it is like having a road and not having parking,” he said.
"We are going well, we are going well, everything has been planned so that we are not going to leave unfinished projects, the projects are going to be finished and they will be delivered before the end of the administration," he stressed.
“Storage of a strategic type is required, we already have the operational one and what we want to start working on is commercial storage, this with the idea that the end user can have the guarantee of the molecule without interruptions and avoid what happened in February 21 and December of last year, that there were problems with the supply of imported gas from the United States”, he noted.
"With these schemes what we want to do is better balance the system so that the service is not interrupted, he insisted."
He explained that there are three storage technologies, one is to use depleted deposits, another is saline caverns, such as those found in the deep Coatzacoalcos area, near Pemex, and the last is liquefied Natural Gas in surface stations, which would be built near the ports, such as the projects that are already underway in Puerto Altamira, Tamaulipas.
He noted that public policy establishes a storage of 45 billion cubic feet per day, which is equivalent to around five days and the one that is operating is in liquefied natural gas terminals.
"Traditionally in Mexico the same packaging was used, the same pipeline as storage, because this pipeline has an estimated capacity of around, for example, 9 billion cubic feet per day and currently 6 are moving," he said.
“Now with the increase in production in the southeast and with the demand, which is part of this exercise that we are doing, well, we have to start looking at other schemes, because it would no longer be enough to store in the pipeline, they will already be required. other support systems to be able to continue guaranteeing the gas supply”, he pointed out.
He stressed that the national production of Natural Gas has preference over imports. "This is part of the president's (Andrés Manuel López Obrador) policy, that is, the national part always has preference over an imported one," he said.
"Here we want what we tried to do, it is good to place or try to place that increase in national production," he added.
When participating in the Forum, which was not attended by the head of the Secretary of Energy (Sener), Rocío Nahle García, the director of Cenagas commented that the space seeks to know where and when fuel is required throughout the country.
“Thus, we will identify the projects that will be proposed to Sener, previously presented to the Energy Regulatory Commission (CRE) for the issuance of its technical opinion to be part of the fourth annual review of the five-year plan for the Expansion of the National Transportation and Storage System. Integrated Gas 2020-2024”, he indicated.
https://www.jornada.com.mx/notas/2023/06/07/economia/parques-industriales-del-ciit-requieren-11-mil-millones-de-pies-cubicos-de-gas-natural/
Reminder of SOME of the iHub rules that could apply to THIS board
https://ihwiki.advfn.com/index.php?title=Handbook
Personal Attack
- This is when someone attacks one or more members personally rather than the content of that Member's message. The post does not have to be addressed to the "target" of the attack to be considered a Personal Attack. If it attacks a messenger rather than the message, it qualifies for deletion and it is expected that Moderators will remove it.
Off Topic
- Posts about or focusing on other Members or groups of people and their reasons for posting on the board (i.e. "XYZDownDaDrain" is just a basher, ignore him", "XYZToDaMoon" is a pumper", "the naysayers are very loud today", "c'mon, where did all the cheerleaders go?"). The post does not have to be addressed to a specific person. If the post is about other Users then it should be removed.
- Posts with religious or political statements should be removed as "off topic". These inevitably create an avalanche of replies that are off topic as well.
- Posts about Moderators and/or deletions are also "off topic". Issues of this nature need to be discussed with a Site Admin: .
Spam
- Posting the same or almost identical post more than twice within a calendar day i.e. "where's the PR?", "anyone seen the PR?", "thought there was going to be a pr today?", "geez, is the pr coming out today or not?";
I want to continue reminding people of the iHub rules including guidelines for Deletions and Restorations which can be found here:
https://ihwiki.advfn.com/index.php?title=FAQ:Deletions_and_Restores
Here are some exerts from that section that you may find useful:
Are replies to deleted posts supposed to be removed, too?
A good rule of thumb is that if the post can "stand alone" within the TOS, it should remain
This Poster is making libelous claims against our company and its officers! Why can't I remove these posts?
Moderators and Site Admins do not determine that Member posted content is libelous. Users are often of the opinion that a post is libelous, but no Moderator should act based on that opinion. Libel is decided by a judge in a court of law after conducting proper evidentiary hearings.
This guy is just being annoying! What can I do?!
Being "annoying" is not a TOS violation and is very subjective. If his/her posts don't violate the TOS, please don't remove them.
This person lost money here and is very bitter. All he ever posts is negative stuff about the company and the "longs" are sick of it.
Members are allowed to post on the board(s) of their choice as long as they stay within the Terms of Use. Being positive or negative about a company is not a requirement for any Free Zone boards and messages should not be removed on this basis.
This guy is just posting lies; the stuff he says about the company is NOT true. Why can't I delete those posts?
As a Moderator, your role is to enforce the Terms of Use, not make decisions about the veracity of the information posted. Truth" is a very subjective term and neither Site Admin nor Mods remove posts based on judgments of this type. Each reader has both the right and obligation to decide for themselves if they feel a post is accurate and its author credible.
A Member just posted some great dd (due diligence) on the company and in the very last line he called another Poster an idiot for his previous posts. If the majority of the post is okay, why do I have to delete it?
If a post is 99% on topic and 1% personal attack it still needs to be removed. Personal attacks in any form are disrespectful of others and are unwelcome on the site.
This guy never backs up anything he says with proof. We continuously ask for links and he never replies.
Members do not have to provide "proof" when offering their opinions. There is no requirement for Users to substantiate their posts. Veracity of posts and credibility of the author is determined by the reader.
This one guy always changes people's aliases usually to something derogatory. The rest of the post is on topic but this just causes problems.
Users should use the correct alias when addressing another User.
Juicy pr huh? Lol. Nice, cheapies cheapies now. Bwahaaaaa
Old Grifter ward is not very trustworthy. His last scam went bankrupt
Don’t worry boys, there will be cheaper opportunities coming. Lol
I called Tyrus..This is a recap of our conversation ......It "has answers man"
People are dangerous if they don't have there facts straight..Some take a morsel of fact and expand it in any direction that suits a narrative.. Quotes like" I am a notorious penny scammer " Are completely False.. who has Wards lawyer bilked out of funds? Nobody. In 17 years of working for many public companies, he has never recommended reffered or signed up anyone for the issuance of shares..
He was licensed in 7 states...however ,the licenses were not yanked out from him..Due to A legitimate issue with California they mutually decided to withdraw the license.As such, the other 6 were reciprocal licenses that terminated along with his home state..There were no fireworks and essentially,none were needed any longer.
People are totally off base in promulgating that he is dishonest..Yes,25 years ago he did make a couple of mistakes,however,neither of the( two,not multiple) were not related to being dishonest..The federal one only became an issue because he was too honest and forthcoming.It was later analyzed that he didn't even commit a crime! In the second(State) crime I was not convicted,but because I plead Nola contendre( no admission of guilt) Heshows a conviction in a he said,she said situation..As such,mentioning them here is meaningless.
To all who read the OTC pink sheet disclosures and financials,Always beware..The financial statements don't even qualify for the state-of-the-art a compilation.They are essentially company produced financials that have no audit or even compiled standards..He takes what the company supplies and put it into GAAP based financials without examining the data past coordinating into proper financial format.. you will note that the OTC doesn't require the accountant to sign the report.only the CEO and Principal Financial Officer..
Further,people are partially wrong,when they say he doesn't expose corruption..He has reported some to OTC who he found to have committed fraud. However, he generally will not prepare a report for someone who he has found to possibly misled in the information required. Even at the audit level, has anyone ever seen an adverse opinion....where auditors deemed the company so bad that they actually gave a bad opinion ? No,because all of the CPA firms he has worked with resign befor having to issue that type of opinion.
Without his agreeing or disagreeing with vitriol aimed at CMW,he find's comments irrelevant to the preparation of the OTC reports..Peoples objection to the promises he has made in regards to the company and its future.The OTC report does not reflect any sort of promises or projections of future revenues. It's an historical document reporting on the period(in the past) it is related to. Virtriol is irrelevant..
ur telling me, mine is .13 rn
Exactly Ward is playing magician and macfraud and company are creating a mirage. Steal the bacon. Ward couldn’t hit water if he fell out of a boat
wish i was a bit more patient on last two purchases, good prices.
but i still averaged my latest buys to about .06
The U.S. is fully blessing these projects, they are very important for many reasons with global implications
many hurdles and CornPop joey does not make it any easier nor does Amlo...
There maybe infrastructure that will be developed in hopes of a shift in policy in the near future. But let's be honest, Biden sucks and needs to go the way of the dodo bird before anything can be solidified.
Any time there is cross-border trade, especially involving energy, there's like 50 departments that get involved. Unless it's fentanyl apparently. Maybe a fentanyl pipeline would qork better
I dont think Mirage would be going to all this trouble if they felt that there would be regulatory issues. Definitely possible there could be, thats always a risk, but I get the feeling that we'll be fine. Especially for the isthmus project Mirage #3 the US govt. should have nothing to do with it, none of their beezwax.
Followers
|
199
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
41554
|
Created
|
02/11/10
|
Type
|
Free
|
Moderators Macod pepeoil MoneyMike1 |
Announced Projects:
1) CENOTE ENERGY S. de R. L. de C. V. (Subsidiary of Mirage) - Burgos Hub Storage & Natural Gas Pipeline, a US-Mexico development consisting of cross-border transportation and the first underground natural gas storage facility in the country of Mexico. When fully developed, Mirage’s natural gas storage facility will be the largest natural gas storage facility on the North American continent.
2) WPF MEXICO PIPELINES S. de R. L. de C. V. (Subsidiary of Mirage) - SAN FERNANDO/CACTUS. 42" diameter pipeline interconnected to proposed storage facility with interconnects to Station #19 and Los Ramones all on Mexico's National Pipeline System. Including interconnecting and rehabilitating a existing 48" pipeline running all the way to the Isthmus Corridor thus bringing abundant supply of natural gas to the southern region of Mexico. Approximately 1000 miles.
3) NORTHERN HEMISPHERE LOGISTICS, S. A. P. I. de C. V. (Co-Ownership with Mirage) - ISTHMUS CORRIDOR. Includes rehabilitating dock facilities at Coatzacoalcos Veracruz on the Gulf of Mexico side with new monobouys. Rehabilitating 30" & 48" lines running from Coatzacoalcos to Salina Cruz Oaxaca, dock and monobouys in the Pacific side, this including the pumping stations along the track and tankage on both side of the Isthmus.
4) MIRAGE ENERGY CORPORATION - Announces it has signed an agreement with ENERGY AGENCY OF THE STATE OF PUEBLA to develop a pipeline infrastructure project to deliver natural gas to the state and various industrial parks with in the state. This includes the delivery of 500 mmbtupd of natural gas thru this pipeline project. Total estimates cost for development of this project is expected to be s $300 million USD.
========= Projected revenues of all projects have been estimated at $1.5 - $2.5 Billion with Net Income ranging from $500 Million to $1+ Billion ==========
(See chart at the bottom for potential share price scenarios using these estimates)
June 5, 2023
MIRAGE ENERGY CORPORATION AND ITS SUBSIDARIES, ANNOUNCE THE SIGNING OF A BINDING MOU AGREEMENT FOR THE DEVELOPMENT/TRANSPORTATION WITH GRUPO CONSTRUCTOR HERMED, S.A. DE C.V.
MIRAGE ENERGY CORPORATION (OTC PINK: MRGE) and its subsidaries announces it has signed a binding Joint Venture Development Agreement/ Transportation Agreement and off-take agreement.
This agreement BETWEEN Mirage and Grupo Constructor Hermed, S.A. de C.V. is for the development of three projects Mirage and its subsidaries have been devoting time and money.
June 16, 2020
Mirage Energy Corporation and Northern Hemisphere Logistics, Inc. Sign $4 Billion Debt Financing With Bluebell International, LLC for Development of Three Projects Including Pipelines, Natural Gas Storage and Isthmus Corridor Project
Mirage gets 25% ownership in multi-billion dollar projects WITH ZERO DEBT
https://www.globenewswire.com/news-release/2020/06/17/2049382/0/en/Mirage-Energy-Corporation-and-Northern-Hemisphere-Logistics-Inc-Sign-4-Billion-Debt-Financing-With-Bluebell-International-LLC-for-Development-of-Three-Projects-Including-Pipelines-.html
Mirage Energy Corporation Signs Agreement with Northern Hemisphere Logistics, S. A. P. I. de C. V. To Participate in the Development of the Isthmus Corridor Project
March 16, 2020
https://www.otcmarkets.com/stock/MRGE/news/story?e&id=1553878
June 11, 2020
Mirage Energy Corporation Signs Agreement with the Newly Formed Energy Administration of the State of Puebla for Development of Pipelines
https://www.otcmarkets.com/stock/MRGE/news/story?e&id=1623065
May 20, 2020
Mirage Energy Corporation/Northern Hemisphere Logistics, S. A. P. I. de C. V. Signs Agreement with Mexico Labor Union "El Sindicato National De Infraestructura" for the Support and Cooperation on Respective Projects for Each Company
https://www.otcmarkets.com/stock/MRGE/news/story?e&id=1607525
October 8, 2019
Mirage Energy Corporation Wholly Owned Subsidiary, WPF Transmission, Inc., Announces the Signing of an Interconnect Agreement With Whistler Pipeline LLC.
https://www.globenewswire.com/news-release/2019/10/08/1926360/0/en/Mirage-Energy-Corporation-Wholly-Owned-Subsidiary-WPF-Transmission-Inc-Announces-the-Signing-of-an-Interconnect-Agreement-With-Whistler-Pipeline-LLC.html
MOU announced with a billion dollar company, (TrailStone NA Asset Holdings, LLC):
https://finance.yahoo.com/news/mirage-energy-enters-mou-reserved-120000683.html
Trailstone is a subsidiary of Riverstone, "Riverstone is an energy and power-focused private investment firm with $38 billion of capital raised":
https://www.riverstonellc.com
Advantages of Isthmus project = Worldwide implications = HUGE $$$ saved
(from board member: PennyStockTrader2)
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=156268062
The following table is a reference to how one might come up with PPS for Mirage. There are obviously a lot of variables here, but since PPS is often talked about in terms of PE ratio, I thought I would use that as a guide.
I assumed the outstanding count would climb to around 650 million, where 200 mill preferred shares are held by the CEO and not traded, and so I also did a calculation based on 450 million also.
The worst case scenario in the table is 200 mill net earnings and a P/E ratio = 10, yielding a $3 stock. I say worst case in light of P/E ratio where ratios of other midstream pipeline companies.
June 24, 2021
https://mexicobusiness.news/energy/news/natural-gas-storage-remains-do-list
US-based Mirage Energy discussed a 786Bcf storage project with MBN last year. With a capacity as large as this, the project would immediately become the largest single natural gas storage facility in North America. “We are not developing this only as a strategic reserve but as a commercial operation of which industrial players can benefit,” said CEO Michael Ward. As of June 2020, funding for the project has been secured. Now, all Mexico’s government would need to do is give it a green light.
October 5, 2021
Mirage Energy Corporation Pays Off Debt To Power Up Lending
https://www.accesswire.com/666888/Mirage-Energy-Corporation-Pays-Off-Debt-To-Power-Up-Lending
SAN ANTONIO, TX / ACCESSWIRE / October 5, 2021 / MIRAGE ENERGY CORPORATION (OTC PINK:MRGE) announces it has paid off its debt to Power Up Lending as of October 2, 2021. This should be a stabilizing factor to our stock. Furthermore, Mirage no longer has any overhanging notes to affect our market.
Mirage continues to move forward on our US/MEXICO projects with great success being made on all fronts. We are looking forward to closing on these in the very near future.
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |