thanks for finding this interview. I think the important point is that Wade is still saying pipeline will be done by mid 2013. I think that's a very aggressive plan and I personally will be very surprised if they succeed. They still don't have the agreement signed with the pipeline's new owners and they have to build a 53 mile pipeline. If oil flows before Q4 2013, I'll be shocked. We'll see. Nothing goes according to plan in Nigeria but I could be wrong.
Along the same lines, I would like to see them move ahead with the next well. Their drill pace is slow and if they are really going to have behind pipe production, they need to get going.
Holding and Molding!