InvestorsHub Logo
icon url

jeffshir

08/08/12 11:10 AM

#15207 RE: If you build it- #15206

Also this paragraph indicationg that progress is ongoing:

incorporate Liquidmetal processing technology of reactive material into the EMRG, LQMT will
have to establish the following:
1) Build an injection molding system capable of forming full-size projectile bodies
2) Develop technology for processing 4340 sheet material into shaped liners
3) Establish an alloy melting facility
4) Develop post-processing operations and quality control
This work is expected to be completed in 3 QRT 2012