InvestorsHub Logo

Ecomike

04/10/12 10:35 AM

#8430 RE: liketotravel #8429

We are not ignoring any questions, we already know the answer, the cost is minimal per well, and the RTO is about 3 months. The problem is not the wells, the RTO, or the cost of equipping the wells, in fact some are equipped and ready to operate. The problem is the CEO, and the TRRC wants him replaced, or they want the fines paid and the well casings tested, verified to be intact (no leaks) and repermitted to go back into service pumping. If you want to know the truth, read the posts here by Screaming Eagle and Wildcat Driller for the last 12 plus months. The rest of us already know the entire story, history, real risks, and the potential rewards if Wilmont, the CEO, finally sells or gives up control to a real JV partner.