''· 300 Area Accelerated Closure Plan team has been formed with Fluor Hanford, Bechtel Hanford, Inc. and Pacific Northwest National Laboratory participating. The planning effort is on schedule to support a June 29, 2000 transmittal date to RL. · River Corridor Project (RCP) contributed to a Pacific Northwest National Laboratory (PNNL)-sponsored technical review on deactivation and decommissioning with two senior members from the WAK Facility located in Karlsruhe, Germany on June 8, 2000. As part of a Hanford site tour, RCP provided an overview presentation on the 324 Deactivation Project, followed by a facility tour. A presentation was also given in the deactivation progress and challenges at the Karlsruhe facility. · In collaboration with Bechtel Hanford, Inc. (BHI), plans are being developed to demonstrate the use of a 3-D GAMMA camera in the 324 and/or 327 buildings in late June. · RCP participated in a demonstration of wearable computers developed by a German based company called Xybernaut. The Xybernaut systems provide miniaturized, voice-activated audio/visual for improving field productivity and safety. The systems allow for mobile access to databases of manuals, procedures, drawings, video training, and numerous other applications.''