Now you are saying "It would normally include drilling some more 1000 foot holes and some shorter ones to verify the prior findings and to obtain core samples of some new targets."
They DO NOT HAVE A PERMIT DO DISTURB any of the landscape of CM and that means they better not bring a shovel with them, much less haul in a drill rig!