InvestorsHub Logo
icon url

dredgemaster

05/28/11 8:59 AM

#31669 RE: rokosnik #31668

1.5 grams is ONLY visible gold, with the fine and powdered gold will be more like the figures I state ie: 6 grames per ton. More realisticaly 60 to 80 ton for 2 dredges. It does not mater wheather they are working in tandem or not you can only process the volume that the engine and pumps can handle when you have set them up to operate according to the material you are ectracting.
A rough GUESTIMATE:
1 dredge, working 8 hour days, for 150 days will extract enough minerals containing GOLD at a value of: $11,000,000 minimum.
Add REEs.
I speak from knowing what a dredge can actualy do and I believe I have been very conservitive in my calcs.

Dont know if this helps or not.

Manufacturers figures are always stated on IDEAL WORKING CONDITIONS.

Dredgemaster