: 200 tons an hour?

If all 3 of the dredges operated at 50 tons per hour.......(and that's an extrapolated #)......the total through-put would be 150
tons/hr.

But that is not realistic either.......1st, the dredges would not run at full speed for an hour at a time...........so that's unrealistic........2nd, the overburden gravels have to be lifted up before the black sands are revealed and allowed to be processed............this will slow that # way down....to a more realistic #..........dredges will have to work from downstream.....to an upstream movement, so as not to re-work their own tailings.........