Well said CC. Im game to guess. My estimate is 5200oz. will be in the PR.
This is a very rough estimate based on past performance with a dredge pulling a little less than 197oz in a 6 week period. I'm assuming that only the overburden was dredged during that period.
This guess also takes into account 6weeks mining (never in human history) virgin gravel. Im hopefull that such gravel will meet/exceed the 7x-10x multiple given. If thats the case then I underestimated:)
My estimated share price is a stab in the dark but I'm guessing...........03 cents. I wouold also love to see the P/E multiple exceed 10!!!
If we're collecting info, we should add how many shares each of us has...this will show how much combined authority and power this site has. I got 16M, but will need to put more thought into the mining results.