InvestorsHub Logo
icon url

CONCH BOY

10/26/10 10:36 AM

#77446 RE: ScarecrowAlpha #77445

i thought this ws going to be a 70 mW facility
icon url

Grozny

10/26/10 10:38 AM

#77447 RE: ScarecrowAlpha #77445

Laidlaw's Berlin, NH plant will generate 70MW nominal. Renewable Energy Certificates sell for $64.xx per MWhr. That is beaucoup $$$.
icon url

Grozny

10/26/10 10:38 AM

#77448 RE: ScarecrowAlpha #77445

I think you dropped a 0, you meant 70, not 7?
icon url

ebbNflow

10/26/10 10:39 AM

#77449 RE: ScarecrowAlpha #77445

Look in the I BOX. It's 70 MW not 7
icon url

Grozny

10/26/10 10:40 AM

#77450 RE: ScarecrowAlpha #77445

EXECUTIVE SUMMARY
Laidlaw Berlin BioPower, LLC (“LBB”) is proposing to convert and upgrade much of the remaining facility
equipment and infrastructure located at the former Fraser Pulp Mill (also referred to as the Burgess Mill)
in Berlin, New Hampshire (the “Site”) in order to develop a biomass fueled energy generating facility.
Berlin BioPower (the “Facility” or the “Project”) will use whole tree wood chips and other low-grade clean
wood as fuel, and will be capable of generating nominally 70 megawatts (MW) of electric power (gross
output).

http://www.nhsec.nh.gov/2009-02/documents/091216application.pdf
icon url

timdoh2002

10/26/10 11:05 AM

#77455 RE: ScarecrowAlpha #77445

your missing a zero .......try again