Here is the block 1 data from Afren, thanks spp!

All right Larry and John, it's time to burn the midnight oil!

Narrative:

http://home.roadrunner.com/~tryoty/Block_1_narrative.doc

Seismic:

http://home.roadrunner.com/~tryoty/Block_1_seismic.doc
icon url

gglazcon

05/10/10 9:32 AM

#213775 RE: farrell90 #213773

See post #213230 from kingpin on Akpo
icon url

hetherb

05/10/10 9:47 AM

#213778 RE: farrell90 #213773

what does 'departure' mean in drilling depth context? see last paragraph below.

The Akpo challenge

Total says its experience of Gulf of Guinea conditions led up to the Akpo challenge. "Because we have been working in Nigeria since 1962 and operating several large projects we were more than ready to develop a deep-water project, combining our technical expertise gathered in, for instance, Angola, our knowledge of Nigeria and our geoscience expertise."

Total's initial concept for the development was for full gas injection, because studies indicated that a small pressure-drop would cause the reservoir fluid to separate out and jeopardise the recovery of condensate. But this concept evolved into a hybrid scheme, with some gas injected and some landed to Nigeria LNG's gas-liquefaction complex at Bonny, to capture some sales revenue from the gas. The firm says further studies of the reservoir showed, surprisingly, that the reduced injection rate would actually increase the recovery of liquids.

The reservoir will be managed by controlling the gas-to-liquids ratio in the wells, with the condensate plateau maximised by producing from low gas-to-liquids parts of the reservoir first and by controlling the arrival of water in the wells. For pressure maintenance, a large number of water-injection wells will be needed from the start of production – there will be 20 and two more for gas-injection.

The production architecture consists of 22 wells, all pre-drilled and all with 3-D trajectories – there are J-shapes and S-shapes and horizontals with departures of up to 3,000 metres. Total will not answer questions about Akpo costings, but it is clear that the drilling programme will account for a large part of the capital expenditure.
icon url

kownski

05/10/10 10:12 AM

#213782 RE: farrell90 #213773

Farrell,

AKPO's lowest zone is at 12,300 ft. OBO-1's lowest zone is at 12,329 ft with a temp of 181 F. Both are in the Agbada sst and Akata formations.

They drilled OBO deep but found nothing down there.

John

Edit; Keep in mind that some of these uplifts are higher than others. Kina is over 1/2 mile high.