If AMD was having all of these fab problems the Intel employees and contractors continue to repeat, I don't think Dirk would be out in the field.
Last I heard Myer was VP of Engineering. When did he move over to Operations? Was this voluntary or was he demoted because of Opteron's massive schedule slip and failure to achieve its introductory clock rate target?