Hoffman gave his for being late. The 10k is written for events as they stood by December 31, 2023 — excepting subsequent events, so I think the statements from NWBO’s attorneys from the derivative suit are more timely.
The first half inspections will likely include inspections for Flaskworks too so artisan can be approved separately and first prior to the time Hoffman points to as prerequisite first half inspections before any advance. They may be doing side by side submissions with regard to manufacturing with artisan already prepared for inspections and Flaskworks expected to be ready soon once fitted out. Best wishes.