Well I must be dumb with a 5th attempt GED but I was certain that the test kitchen was announced as part of their corporate offices but on the floor below. This is noted in their published lease information and I assumed the walk in cooler was in that space.
They haven’t let out where the processing facility is located, I know they have stated they are using a place that belongs to someone else.