InvestorsHub Logo

B_B!

01/10/24 5:42 PM

#54712 RE: Jack_Bolander #54710

Plug needs to delay the other hydrogen plants until the DOE loan is available, the hubs and the 45V rules are less relevant.

uksausage

01/11/24 7:13 AM

#54716 RE: Jack_Bolander #54710

I wonder what is happening with OLIN i Louisiana and withe the Port of Bruges Plant.
Electrolyser sales have been very high (more revenue from them and cryo than material handling) so curtailing US plant construction may be al they need to right the finances since the cost of H2 will tumble