#20303 RE: old man river #20282

That revenue generated is only at 2 tons per day, not 10 (based on 30 days and 60 tons in a month). 25k divided by 60 tons is 417.00 per ton, per month at partial capacity. At full capacity of 120 tpd, that's 417.00 x 3600 tons or 1.5 mil. I doubt they will run every day so more realistic is 2400 tons per month with a 20 day operation. That's still a respectable 1.0 mil per month which is more then previously projected (500 to 600k per month of rev's).

12 million a year at a single facility is pretty decent being they projected half that in a previous PR.
Bullish
Bullish

DDR

04/25/23 2:13 PM

#20321 RE: old man river #20282

I calculated from the numbers they gave of 60 metric tons produced with over $25k revenue; that calculates to over $416/ton. What numbers are you using? Were you assuming they were at 10TPD at full capacity? It looks like they weren't close to full capacity at 60 tons total.