InvestorsHub Logo

old man river

02/02/23 12:14 AM

#16098 RE: Steve1978 #16092

I was only responding to your 750 million dollar claim. The hubs are designed for production and storage. However, these sites may not be near markets. Consider this for a moment. A dated cost to build a natural gas pipeline is about 8 million per mile. Inflation and the issues with hydrogen could take this to 15 million per mile. So, the entire budget using your hub number is about 500 miles. The cost to store and retrofit a gas station, not talking about building new, should be about 250k per station but it could be higher. Pressurized trucks or chilled trucks and railcars do not come cheap. We need to consider McCarthy wanting to reduce spending which could kneecap the Act.