InvestorsHub Logo

joseytheoutlawwales

01/11/23 4:52 PM

#25373 RE: Gumpstein #25372

“Good question. The black boxes will theoretically be rolled out upon conceptual completion when code requirement’s have been met, city council has had a chance to muse wistfully upon them, and when an as-of-yet unknown space raw element material from a meteorite in a distant asteroid belt finally lands on earth, we achieve the necessary documentation to retrieve said elements, and then our black box drawings can be built. But only after a lengthy review of contractors and contractual obligations.” Direct from management ;.)