different info being presented at times
this example,,on different company.
Petrotal Corperation thier last three wells intial flow rate average 10,000 barrels a day, the production rate is 3000 to 4000 barrels a day. For the BOD to reach a long term production target of 750 a day it has to start off at over 1000 Barrels.
that is from lots of perforations on horizontal.
Pantheon did only 10ft of perforation in only limited area of horizontal
then ask also quality and value p/barrel.
then ask, their overhead costs p/barrel for continued production long term
Bullish