There’s no doubts they will be performing a much larger acid stimulation or other type of stimulation once materials, personnel, and equipment are fully on site. The batch of pics I posted shows PSI is already on site in part probably doing the DST plus other wireline services.
I don’t think we will a traditional water frac like what other nations are accustomed to. Just not too sure of the extent of the stimulation they will use though.