Any prognostication about missing a goal in the future must wait until that future date.
When it comes to a pre-revenue tech.. the powers-that-be sometimes take total control over the timeline..
Taiwan semiconductor, globalfoundries and the like are not at the whim of smaller Tech firms trying to impose their goals on preexisting fabrication schedules.
Just saw your reply, give it to me in quotes with where I can find it. I think you are listening to some on here that say things as if they are gospel.