InvestorsHub Logo

m polo

12/30/20 11:22 AM

#90202 RE: uber darthium #90201

you well note your problems and risks shareholders have. but you are long. are you positive long, or just trying to recoup a paper loss before selling out.

tantalos60

12/30/20 12:04 PM

#90206 RE: uber darthium #90201

I believe I posted my exceptions two years ago.
I've been an Industrial Mechanic for over 40 years. An Industrial Electrician for over 20.
As far as I can tell..I'm the only poster who recognized that their system used a MIG welder as a means to regulate their voltage.
Well and good. If properly utilized and safeguarded it works. Fine voltage control.
Their associated wire runs were nothing I would have put my name on.
I would have placed everything in emt and put gurneys on everything. Square and level. I take pride in doing it right the first time.
As for you...i question your expertise based solely on your exceptions.
I would have never passed their wiring job.
If it was in Code it was just barely.
I am available to come to their facility and unfuck their wiring issues. Cash upfront and any tools and materials I need.
I would bring my basic tools and wire pulling equipment. I'm off till January 25th.
Fly me in and put me up. Feed me shrimp.

I work for Armaly Brands.
Worked for Church and Dwight, Purex, and Dial Corporation.
Once a run is completed, tie in only requires 20 to 30 minutes. If that.
I'm off for multiple mild strokes.