Nine? Really? Wrong. SHMP has 4 in LaCoste, operating, presumably. 2 more passed final inspection in Colorado Springs. I doubt that those units are installed already. Might even still be in transit. But prove me wrong.
SHMP ORDERED 3 more units, for a total of 9. SHMP's PR said "will"...future tense. Need to pay attention.