InvestorsHub Logo

spec machine

04/04/19 4:05 PM

#1957 RE: MktMvn #1956

unfortunately, the website and filings do not differentiate between bypass and sidetrack

in fact the permit is permission to drill a bypass and the status then becomes AST or "approved side track"

that was the latest status posted for the Tau wellbore - AST

spec