So, what you are saying is that, right at this moment, Engel E-100 machines, which have a lot less of a lead time to construct, will be installed in the same time frame as the Eontec DC and MIM machines and all three types will be production ready in 3 quarter.
If so, why would Lugee Li only mention 2 Eontec machines being ready in 3Q but not the number of Engel machines to be operational at LF?
And he made no mention of moving any machines from RSM to LF, no?
Please clarify that for me. Thanks.
Yes, what you quoted might be true, but why wasn't Engel fleshed out as well as the Eontec machines in the statements?
I am always open to challenge, just as any poster should be.
Therefore I challenge you to provide a reasonable explanation to mine made in this post.