InvestorsHub Logo

ammobox

12/01/16 10:36 AM

#162 RE: Gcasa #161

I wish the Company would come out with a progress report from Chapman Petroleum Engineering Ltd to confirm and quantify the reserves on Block 19. They should have been in Peru by now and have there survey completed. Back in May 2016 Chapman was expected to be in Peru with in 30 to 60 days. Seem to me that should be plenty of time to get a report filed.