InvestorsHub Logo

Stanner

05/27/16 11:05 AM

#82787 RE: towerclimber92 #82774

TPAC~gm TC92-Its Boeing that_TPAC_hasto convince concerning capacity_&_capability.TPAC hopes that the SLAs' will satisfy Boeing that_TPAC_ is a bearing manufacturer from raw material to inserting the liner, to out the door.

January 2017 appears to be the established target date now, to do a Boeing order.

IMO there is a Boeing checklist of things that have to be done before Boeing would place a contract in TPACs' hands.

IMO _TPAC_ needs to show Boeing that_TPAC_ is a one-stop Aerospace parts shop.

IMO TPAC needs a facility,(that is why I pressed for a TPAC sign at the factory-We don't have one)

IMO-TPAC still needs one key manufacturing acquisition (not a SLA type),

IMO-TPAC needs A bank RLOC-(revolving line of credit)-not a superstar day-trader who is going to tick-flip Wall Street and make TPAC millions

TPAC can only do the liner-they had to outsource to do the $100,000 order.

Wait for 10Q for verification of current operation(s) picture (structure)