InvestorsHub Logo

gorgol

07/29/15 9:18 AM

#73826 RE: rige #73822

That's why I'm crossing my fingers and having hope on the ENGEL Europe prototype announcement.

and that its a big contract....that could catch the interest of a big manufacturer in the US. Then the

ball can get rolling. The knife contract was good to show what can be done....but....I'm afraid I know

what happened to those 100+ RFQ's. Again, with the question asked Steipp about the time it takes

to go to production.....it was a lousy answer. He made it sound like no matter what it is, it would take

9-12 months. He should have taken the time to say it depends on the item...which is obvious....

and if its a totally new design or making a current product out of Liquid Metal...he messed up royally

with his answer. And that was to funds and stockholders... BIG MISTAKE...another one. He needs to

step back and let HOUCK answer the questions....he's not capable of thinking on his feet.

I'm really bashing him this morning......but I feel I'm justified......