InvestorsHub Logo
icon url

gorgol

07/29/15 4:12 AM

#73812 RE: rige #73809

Yes, that is the question in a nut shell. Steipp was talking about LQMT"s time frame, with limited personnel and limited resources. Hopefully its much different if Engel does it. Also there will be two different categories of parts/items made. "New Part/ Item" and "Already existing part/Item, made of a new metal." Plus the complexity. To say that both categories will take the same amount of time, is taking Steipps words too literally. I believe the "already existing part" will be the majority of contracts with a much shorter time frame to production.