InvestorsHub Logo

tykundegex

06/10/15 12:35 PM

#283336 RE: Los_Venados #283334

Same smoke, different mirrors.

Rail spur in NF was supposed to mean lots of cargo. Concrete pad at RKT was supposed to mean buildings for processors. DEC permits in NF was supposed to be mean production.

Even IF these things are all happening on some site related to EcoNav, I certain the likelihood of it leading to anything is still about the same as it was for JBI in NF or Clearwater, FL.

100% CORRECT DD

06/10/15 12:43 PM

#283337 RE: Los_Venados #283334

I drive by the PTOI's buildings for years and have stated what I witnessed. I do not believe a single word you said below but I hope to God you are correct with your statement below. I hope they sign 5, LOI's for 2500 machines. I hope the price skyrockets to $100. I hope they uplist ASAP.... You know why, cause once its time for the machines to start processing, they won't be able to, they can't process and the company (buyer) will sue the living crap out of P2O just after I short the stock at around $99.










Logically since manpower is minimal and construction of another facility is underway pretty much everyone imo has been diverted to the other location now. Stack test reports will show a increase in emissions for this other site, its all on the DEC website if you know what to access and having an account gets premium content. DOT permits will show roadways being widened to handle a steady stream of trailer traffic. There is a significant build out going on to accomodate these P20 machines. The weather hasnt helped and is always a factor in scheduling ribbon cutting. I think Cuomo is going to be there.

Looks like Iroquois is getting retro'd to be a manufacturing facility if OBG is doing it like Rick said.

These tests must have yielded positive results as suitors are lining up to get a batch.

2.5 million times 2500? like the original Sousa goal, the second facility has to be swinging its gates open

underdog150

06/10/15 6:35 PM

#283353 RE: Los_Venados #283334

Lol, much like all the other PTOI misinformation over the years, is this reliable? Knowing when insiders change their ride, I think not.
------------------------
Logically since manpower is minimal and construction of another facility is underway pretty much everyone imo has been diverted to the other location now. Stack test reports will show a increase in emissions for this other site, its all on the DEC website if you know what to access and having an account gets premium content. DOT permits will show roadways being widened to handle a steady stream of trailer traffic. There is a significant build out going on to accomodate these P20 machines. The weather hasnt helped and is always a factor in scheduling ribbon cutting. I think Cuomo is going to be there.

Looks like Iroquois is getting retro'd to be a manufacturing facility if OBG is doing it like Rick said.

These tests must have yielded positive results as suitors are lining up to get a batch.

2.5 million times 2500? like the original Sousa goal, the second facility has to be swinging its gates open pretty soon.