InvestorsHub Logo
Followers 0
Posts 124
Boards Moderated 0
Alias Born 04/27/2015

Re: 100% CORRECT DD post# 283321

Wednesday, 06/10/2015 12:19:52 PM

Wednesday, June 10, 2015 12:19:52 PM

Post# of 312014
Logically since manpower is minimal and construction of another facility is underway pretty much everyone imo has been diverted to the other location now. Stack test reports will show a increase in emissions for this other site, its all on the DEC website if you know what to access and having an account gets premium content. DOT permits will show roadways being widened to handle a steady stream of trailer traffic. There is a significant build out going on to accomodate these P20 machines. The weather hasnt helped and is always a factor in scheduling ribbon cutting. I think Cuomo is going to be there.

Looks like Iroquois is getting retro'd to be a manufacturing facility if OBG is doing it like Rick said.

These tests must have yielded positive results as suitors are lining up to get a batch.

2.5 million times 2500? like the original Sousa goal, the second facility has to be swinging its gates open pretty soon.






Viva La Cuba




"Better to remain silent and be thought a fool than to speak out and remove all doubt." --Abe Lincoln