InvestorsHub Logo
icon url

kownski

05/24/06 12:12 AM

#1145 RE: dbernet #1144

Dbernet, I was just popping off (old habit I'm trying to break) Pup knows better. He's a very sharp man and was probably thinking of a well flo test or something like that.

Anyway, IMO the DWD drilled the obo 1 then drilled a well for XOM, (think I saw that in the DWD schedule) then came back and drilled obo 2 that was finished a few days ago. I still think they would run a DST on each pay zone and most big companies want to core each zone either with a core barrel on drill pipe or wall core on a wire line unit.
They could have run the DST 15 min open 30 min shut in and another 15 open under a very small choke which would give them pressure, flo rate, water, oil, gas or % of each and all could be held in one mud pit. Like Pup said, you don't throw a well wide open unless you want to ruin it.

John