InvestorsHub Logo
icon url

Eli's Gone

10/08/14 12:48 PM

#144953 RE: rl71852 #144952

From last nite's NR:

The plotting of the drill grid on a 400 m (1,320 feet) square pattern in the main target is now complete. We have also marked the hole locations with labeled, 2” x 2” x 5’ long wood posts so that the drillers can go easily from drill hole to drill hole as directed. No roads will be used but instead paths for rubber tracked equipment will be used, as previously explained in News Release 187 (8/12/2014). In our Exploration Plan of Operation submitted to the Arizona State Land Department (ASLD), we proposed rubber track paths using a course of least resistance so no mechanical bulldozing or road building would be used. The ASLD has agreed to it, but has required that the paths be surveyed by a Registered Professional Archaeologist.



please see Item 10 in the EPO submitted here:

https://d13mlwa9pj59gn.cloudfront.net/sites/default/files/documents/files/MINMATEXPPLAN.pdf

it's up to the state to determine what is required---and they did--and Liberty will now comply :-)
icon url

leifsmith

10/08/14 1:10 PM

#144954 RE: rl71852 #144952

It's not reasonable to not care about provision for efficient drilling. I used that as only one example of progress. There are many. The permits are not a problem.