From last nite's NR:

The plotting of the drill grid on a 400 m (1,320 feet) square pattern in the main target is now complete. We have also marked the hole locations with labeled, 2” x 2” x 5’ long wood posts so that the drillers can go easily from drill hole to drill hole as directed. No roads will be used but instead paths for rubber tracked equipment will be used, as previously explained in News Release 187 (8/12/2014). In our Exploration Plan of Operation submitted to the Arizona State Land Department (ASLD), we proposed rubber track paths using a course of least resistance so no mechanical bulldozing or road building would be used. The ASLD has agreed to it, but has required that the paths be surveyed by a Registered Professional Archaeologist.



please see Item 10 in the EPO submitted here:

https://d13mlwa9pj59gn.cloudfront.net/sites/default/files/documents/files/MINMATEXPPLAN.pdf

it's up to the state to determine what is required---and they did--and Liberty will now comply smile

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LBSR News