lol, this is trading in the trips and people want the sky.
Andes Gold owns two producing mines and one fully operating mill. • The mill is currently processing 50 tons of ore per day • The capacity of the mill is increasing and is expected to be at 150 tons per day by the end of March 2012. • The average head grade of ore being processed is 1.0 oz gold and 15 g of silver per ton of ore. • Andes Gold processes ore from other mines. This increases cash flow and profits. •On the Miranda vein, the company has 95,000 oz. of proven reserves. Inferred reserves from the 700 m level on Miranda, Azul, Estrella, Sul and Viscaya veins are 600,000 oz. • Andes Gold continues to develop existing reserves as well as acquire new reserves. • Andes has begun reclamation programs on its projects.
Revenues increasing to offset gold price fluctuation.