LOL from 200 tons of rock they got crumbs. That gold you see is called unfeasible gold. The whole bottom of that pan needs to be filled to make a feasible mine from the amount of rock they ran.
That is pretty pathetic for a gold mine even if it is "mined out" channel. They should have at the very least had 10x that much. The area of the white was supposed to have at least .05 per ton wasnt it?
If that is what they get for "grade/yield" of a sample they are in pretty big trouble. Well many claim the black channel will be better (if we ever get there.) But the history of the black channels seems to say otherwise.
IMO it would be better to have the company acknowledge their failure to keep their word on the 6-8 weeks in a PR than to show the failure of the sampling in a picture.