InvestorsHub Logo
Followers 1
Posts 550
Boards Moderated 0
Alias Born 03/06/2003

Re: sgolds post# 69524

Saturday, 01/14/2006 10:50:52 AM

Saturday, January 14, 2006 10:50:52 AM

Post# of 97730
AMD would need a home run with 65nm to solve this problem.

I'd imagine that they'll start converting FAB30 to 65nm as they develop confidence in the 90nm process in FAB36. Therefore the 2006 ramp in production may not be as pronounced as some believe but should still be significant. BTW, Chartered was originally scheduled to come online as a 2nd source in 2006. Does anybody know if this is still on schedule? Considering AMD's history at 2nd sourcing CPU production I'm not banking on any 2006 output. In fact, I'd be pleasantly surprised to see anything in 2007.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent AMD News