Now that de-watering contract has been let to the same outfit that does Las Cruces, (See Las Cruces on Inmet site.), we will be able to start shipping ore from Spain and Portugal by the start of FY 2015 Which is June 1, 2014. that is twelve months away. With the POG holding at current level it will be very profitable if the g/t prove to be correct.De-watering should take about six or seven months.