InvestorsHub Logo
Post# of 4988617
Next 10
Followers 3194
Posts 56231
Boards Moderated 3
Alias Born 05/28/2006

Re: 9HikeDiscGolf post# 2651923

Monday, 04/30/2012 8:47:45 AM

Monday, April 30, 2012 8:47:45 AM

Post# of 4988617
$NBRI news out!>>>>>North Bay Resources Inc. (NBRI): Ruby Mine Progress Report

SKIPPACK, PA, Apr 30, 2012 (MARKETWIRE via COMTEX) -- North Bay Resources Inc. (OTCBB: NBRI) ("North Bay" or the "Company") is pleased to issue the following shareholder update on the status of current operations at the Ruby Mine.
The Ruby Tunnel rehab project continues to make steady progress. With the exception of several weeks at the end of March and early April when work was temporarily interrupted from a series of rolling snowstorms in the Sierras, work has continued unabated throughout the winter months and into the spring.

The crew is presently working at the lowest and narrowest location in the Ruby Tunnel. It is slow work, as the tunnel is being now being widened to more appropriate mining dimensions consistent with the rest of the tunnel. This involves considerable jacking along with driving the support materials overhead and mucking out extraneous rock and debris. Additional permanent timber sets are also being installed to reinforce the roof and ribs in this section of the tunnel.

As always, we will continue to keep shareholders informed of our operational progress as we proceed forward towards the start of production.

About The Ruby Gold Project

The Ruby Mine, a/k/a the Ruby Gold Project, is a fully-permitted underground placer and lode mine located near Downieville in Sierra County, California that is known to have produced over 250,000 ounces of gold since the 1850s, and which is considered to be part of the northern extension of the historic Mother Lode system. The Ruby Property covers approximately 1,755 acres, consisting of the subsurface mineral rights of two patented claims totaling approximately 435 acres and 30 unpatented claims containing approximately 1,320 acres. The equipment, fixed assets, and infrastructure in place include a 1,000 yard per day placer wash plant, 50-ton per day quartz mill, 6,000 feet of tracked haulage, and related support equipment needed for underground mining operations. The property also features an excellent system of roads, is accessible via paved highway from Reno or Sacramento, has abundant water and timber available for mining purposes, and has PG&E power available on-site. For further information about the Ruby Mine, please visit the Ruby page on the North Bay website at http://www.northbayresources.com/ruby/.

Join InvestorsHub

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.